For A-frame prefab home purchases, the listed payment arrangement is a 30% telegraphic transfer (T/T) prepayment, with the remaining 70% payable against a copy of the bill of lading. Since the A-frame product record does not specify a separate payment calendar, confirm the exact terms and project requirements in the written quotation before placing an order.
| Stage | Documented term | What to confirm |
|---|---|---|
| Prepayment | 30% by T/T | Due date, bank details, currency, and the order documents it covers |
| Balance | 70% against a copy of the bill of lading | Shipping scope and the documents required for payment |
| Freight | Sea shipment by FCL or LCL | Destination, freight responsibilities, customs, and unloading arrangements |
The available commercial information describes two payment stages: the initial 30% T/T payment and the 70% balance linked to a bill of lading copy. It does not establish standard payments for design approval, production completion, loading, installation, utility connections, or final acceptance. If a project requires any of these milestones, they should be documented separately in the quotation or contract.
Purchases are handled as project-based orders and cooperation. The written quotation should set out the order quantity, A-frame specifications, delivery schedule, inspection requirements, and any after-sales support applicable to the project. It should also state the payment currency, banking information, quotation validity, and conditions for accepting the goods.
The product listing identifies an A-frame house but does not provide a specific model configuration, order quantity, destination, or delivery timeline. Before sending the prepayment, request the relevant drawings and confirm materials, included fittings, packing details, and the responsibilities assigned to each party.
Because sea freight is listed as FCL or LCL, clarify how transport relates to the bill of lading payment milestone. The agreement should identify who handles packing, freight, customs, unloading, foundations, installation, utility connections, and acceptance. Do not assume these services are included unless the written project documents say so.
Company records list an ISO 9001:2015 Quality Management System Certificate and a Certificate of Conformity of the Factory Production Control under EN 1090-1:2009+A1:2011. Verify the certificate holder, issuing body, validity, covered product, and destination-market scope. Certifications do not replace project-specific specifications, a purchase agreement, or local approvals.
YOUTOME discusses adaptable spaces for residential living, accommodation and hospitality, business and display, work and production, connected or combined uses, and public or community services. State the intended application when requesting a quotation. For guest accommodation projects, distinguish the building supply from local operations, cleaning, maintenance, equipment, and other site services.
The listed payment method specifies 30% T/T in advance and 70% against a copy of the bill of lading. Confirm whether those terms apply to your particular order in its written quotation.
No. The stated balance is tied to shipping documentation, not installation or site acceptance. Unloading, foundations, assembly, utility connections, and final acceptance should be covered separately if they are part of the project.
Confirm the configuration and drawings, quantity, materials, included components, destination, shipping method, quotation validity, payment details, inspection criteria, and responsibilities for each delivery stage.
The recorded terms for purchasing an A-frame prefab home are a 30% T/T prepayment and a 70% balance against a copy of the bill of lading. Sea freight by FCL or LCL is listed, but the product information does not define a model-specific schedule or full delivery scope. Use the written quotation to agree on precise milestones, shipping responsibilities, and acceptance conditions. For technical guidance or project support, contact bfc@buyfromchina.cn.
Guangdong BFC Technology Co., Ltd. operates YOUTOME as an independent brand focused on housing and adaptable physical spaces. The website supports discussions about project applications, requirements, purchasing, and local cooperation. Product configurations, pricing, delivery duties, and cooperation terms are determined for each project. BFC works with modular building manufacturers and component suppliers to coordinate procurement, supply, and export for overseas projects.
Listed credentials include the ISO 45001:2018 Occupational Health and Safety Management System Certificate and an SGS supplier audit covering foreign trade capability, research and development, production capacity, and quality control. Cooperation cases include accommodation, villas, event lodging, dormitories, schools, and outdoor camps in several countries.

REPORT