For a bulk order involving shock-absorbing lining used with bathtub accessories, buyers should reserve approximately 25 days for product production and delivery. Although HTH's general PU product information indicates a 2–25-day delivery window, the specific product listing states a 25-day lead time. Orders should also account for the listed 200-piece minimum quantity, while ocean, air, and land freight schedules must be confirmed independently.
The item is listed as shock-absorbing lining within the packaging aids category. Its product record specifies a 25-day delivery time, with quality checks performed during manufacturing and a final appearance inspection completed before packing.
HTH's wider PU product business information gives a delivery range of 2–25 days. For a bulk bathtub accessory purchase, the product-level 25-day estimate is the more dependable starting point because it reflects the selected item rather than the shortest possible timeframe across the full product range.

After production planning is established, buyers can choose among FBA sea freight, air freight, or land freight. HTH reports that it photographs shipments and supplies the bill of lading number and shipping order number after booking. Updates may also cover port arrival, customs clearance, and warehouse receipt.
The available product information does not provide fixed transit times for each freight method. Therefore, transportation duration should be requested separately and added to the 25-day product lead time when calculating the complete order schedule.
Payment can be arranged through TT, with an advance payment followed by the balance before delivery, or through Alipay. Foreign trade contracts and cross-border payment channels are included in the described purchasing process.
HTH states that all products are covered by ISO9001 certification, while bathtub pillows hold CE certification. The manufacturer also reports more than 10 years of cooperation with a United States importer and distributor for shower seat products. Customer feedback highlights assistance with shipment rescheduling, consistent inspection procedures, and early notice of material price changes.
| Planning Factor | Available Details | How to Apply It |
|---|---|---|
| Shock-absorbing lining | 25-day delivery time and 200-piece MOQ | Set 25 days as the initial product lead-time benchmark |
| General PU product range | 2–25-day delivery range and a general 1-piece MOQ | Verify the schedule and MOQ for the exact product configuration |
| Freight services | FBA sea, air, and land freight | Confirm transit duration after production requirements are approved |
| Payment terms | TT advance payment with final payment before delivery; Alipay available | Record the agreed method in the applicable foreign trade contract |
Allow 25 days for the shock-absorbing lining according to its product listing. The broader PU product range shows a 2–25-day window, but the item-specific estimate is the better baseline for planning.
The listed MOQ for the shock-absorbing lining is 200 pieces. Since the general PU business model shows a 1-piece minimum, confirm the applicable quantity for the selected design, customization level, and order arrangement.
Yes. HTH describes FBA sea freight, air freight, and land freight services. Because the supplied information does not include transit estimates, request a separate freight quotation and delivery schedule.
For scheduling purposes, bulk buyers should allow about 25 days for the shock-absorbing lining, prepare for a 200-piece minimum order, and add the confirmed freight transit time to the overall delivery plan. HTH supports OEM/ODM production, process inspections, finished-product appearance checks, TT and Alipay payments, and several logistics options. The company reports monthly production capacity of approximately 50,000 pieces and ISO9001 certification across its product range. For technical assistance or a detailed quotation, contact tongxin@tongxinyz.com.
Foshan City Heart to Heart Household Wares Manufacturer designs, manufactures, and sells PU products such as bathtub pillows, backrests, cushions, armrests, shower chairs, medical equipment accessories, beauty and sports equipment components, furniture parts, and automotive parts. Founded in 2002, the company operates a factory of approximately 5,000 square meters and reports output of about 50,000 pieces per month. Its certifications include ISO9001 and CE, and its products serve customers across several industries.