When a High Voltage Power Transformer is customized, technical drawings and CAD files may be exchanged during quotation, design confirmation, and manufacturing. However, the available product information explains transformer testing and support rather than how digital design files are protected. It does not confirm encryption, user permissions, secure storage, backup controls, or post-project deletion.
Customers should therefore obtain specific answers from the supplier before sending sensitive drawings. File access, approved use, transfer procedures, retention periods, and deletion or return requirements should be documented in the quotation, contract, or a separate confidentiality agreement.
The product is described as a low-loss, high-voltage oil-immersed power transformer with a rated voltage of 110 kV, a stated capacity of 1,800 kVA, and a frequency of 50/60 Hz. The indicated delivery period is 45–60 working days after the deposit is received and the technical drawings are confirmed. This establishes part of the project timeline, but it does not explain how the drawings are secured during that process.
Before transferring files, the buyer should ask for written clarification about access authorization, file-transfer channels, storage locations, backup practices, employee permissions, subcontractor involvement, and the final disposition of the data. If confidentiality is important, these requirements should be incorporated into the project agreement rather than left to informal communication.
Vziman’s listed quality procedures include factory acceptance testing, routine tests, type tests, and inspection before shipment. The product information also refers to compliance with IEEE and IEC standards. These activities help verify the transformer’s performance, construction, and quality. They do not, by themselves, confirm that CAD files are encrypted, access-controlled, or handled under a formal confidentiality policy.
The company profile also mentions UDEM certification for substations, transformers, and switchgear, as well as CNAS information relating to testing of a specified oil-immersed transformer model. Neither certification reference describes controls for protecting customer design files. Buyers should request separate information-security commitments if those controls are required by their organization.
For an initial quotation or technical review, provide only the drawings, specifications, and design details needed to assess feasibility. Sensitive information that is not necessary at that stage can be withheld or shared later under stronger contractual controls.
Ask who will receive the files, whether access can be limited to designated project personnel, and how files will be transferred. Confirm whether outside engineering, production, or service partners can access the information.
Agree on how long the supplier may retain the files, whether copies are kept in backups, and whether the data will be deleted or returned after completion. The available product information does not state that any particular retention or deletion control is provided.
These precautions may be especially relevant for new energy plants, industrial facilities, and commercial complexes, which are among the listed application scenarios. The company profile also describes projects such as a Madagascar grid renovation involving two 25 MVA, 63/35 kV transformers and a 110 kV GIS project in Suriname. These examples indicate project experience, but the supplied case information does not explain how the related CAD files were protected.
| Project area | Details stated in the available information | Additional CAD-security questions |
|---|---|---|
| Transformer design | 110 kV rated voltage, 1,800 kVA stated capacity, and 50/60 Hz frequency | Which drawings, models, and technical documents are actually required? |
| Drawing approval | Delivery timing begins after deposit and technical drawing confirmation | Who can access the files, and what secure transfer method is used? |
| Testing and compliance | FAT, routine testing, type testing, inspection, and stated IEEE and IEC compliance | Are confidentiality, encryption, and access-control measures documented separately? |
| Technical support | 72-hour global technical response, commissioning, training, spare parts, and remote diagnostics | Will drawings remain accessible after delivery, and how will old copies be removed? |
No. The available information discusses transformer specifications, testing, standards, delivery, and support, but it does not state that CAD files are encrypted.
No. These tests evaluate the transformer and its compliance or performance. They do not establish how customer drawings are stored, transferred, accessed, or deleted.
Request written terms covering authorized users, secure transfer, permitted use, subcontractor access, storage, backups, retention, and deletion or return. The supplied product information does not specify these arrangements.
The available information does not establish a defined security system for CAD files used in High Voltage Power Transformer customization. Technical drawing confirmation is part of the engineering workflow, not proof that the files are protected. Before sharing proprietary designs, obtain project-specific commitments and provide only the information needed for the current stage of work.
Vziman identifies itself as Zhejiang Vziman Electric Power Technology Co., Ltd. Its profile describes research and development, manufacturing, and service for power equipment. For technical solutions or support, contact support@vziman.com.
Zhejiang Vziman Electric Power Technology Co., Ltd. is described as the parent company of Zhejiang Vziman Electric Group Co., Ltd., whose related firms originated from Zhejiang Powertech Electric Co., Ltd. The group is described as specializing in R&D, manufacturing, and service for power electrical equipment, including transformers, switchgear, distribution equipment, and power automation systems. Its profile states that it serves projects across more than 100 countries and lists UDEM and CNAS certification information. The profile also describes utility and industrial project cases in multiple regions.

REPORT