Final payment terms for the YT-CJ-4 Fabric Slitting Machine may be connected to inspection and successful machine testing if both parties agree in advance. However, YUANTIAN’s published payment standard is a 30% advance deposit followed by payment of the remaining balance before shipment. Since customer inspection after testing is not listed as an automatic payment condition, buyers should negotiate and record any alternative arrangement in the sales contract.
Payment and quality verification are related but separate stages of the purchasing process. Under YUANTIAN’s standard terms, the final balance is due before the equipment leaves the factory. At the same time, the manufacturer conducts testing before dispatch to confirm that the machine operates according to the required performance standards.
A buyer may request that the balance become payable only after an agreed inspection or acceptance test. This is possible only when the supplier accepts the proposal and the relevant conditions are added to the contract. The current published information does not indicate that post-inspection payment is routinely included.
For overseas orders, Foshan Yuantian Mattress Machinery Co.,Ltd applies quality and environmental management practices associated with ISO 9001 and ISO 14001. Its production controls include incoming checks for steel, electrical components, and transmission parts, three-stage inspections of key components, complete-machine testing, export preparation, anti-corrosion and moisture protection, and production traceability.
The YT-CJ-4 Fabric Slitting Machine belongs to YUANTIAN’s Mattress Quilting Series. The listed specifications include a maximum cutting width of 2400 mm, a minimum strip width of 40 mm, cutting thickness of up to 50 mm, and an approximate weight of 900 kg. It uses a 3-phase, 380 V, 50 Hz power supply, while customized configurations may be available according to project requirements.
If the buyer wants to release the final payment after successful testing, the contract should define the complete acceptance procedure. Important points include the testing location, inspection schedule, test workload, performance criteria, acceptable tolerance levels, safety requirements, documentation, responsibilities of each party, and the date or event that triggers payment.
The agreement should also explain what happens if the machine does not pass the test. It may specify a correction period, repeat testing, responsibility for travel or inspection costs, and the conditions for shipment or payment release. These details should be settled before production begins, because the published standard remains payment of the balance before shipment.
YUANTIAN reports experience serving mattress machinery buyers in various markets. A Brazilian customer highlighted the machine’s production capacity, touchscreen parameter changes, and reduced dependence on operator experience. A Vietnamese customer described cooperation that developed from semi-automatic equipment toward fully automatic and intelligent production lines.
| Category | Published term or practice | Recommended contract treatment |
|---|---|---|
| Initial deposit | 30% advance payment | Confirm the deposit amount and payment deadline before production |
| Remaining balance | Due before shipment under the standard arrangement | Change the release point only through a written agreement |
| Factory testing | 24-hour no-load and load testing for finished machines | Request test reports and identify the acceptance criteria |
| Buyer inspection | Not published as a standard payment requirement | Define the inspector, inspection scope, timing, and approval process |
| Other payment methods | Irrevocable sight L/C, negotiable D/P and D/A for long-term customers, plus Western Union and PayPal for small orders | Confirm availability based on order size, relationship, and transaction terms |
| Product delivery | 50–60 days for the YT-CJ-4 listing | Use the final confirmed schedule in the purchase contract |
It can be requested, but it is not presented as YUANTIAN’s standard payment arrangement. The inspection-linked payment process must be accepted by both parties and written into the contract.
The finished machine is subjected to a 24-hour no-load and load test. The stated evaluation covers operating stability, precision, noise, and safety. Export preparation also includes anti-corrosion, moisture-proof, and shipping-adaptation checks.
The listed options include T/T with a 30% deposit and balance before shipment, an irrevocable sight L/C for large overseas orders, negotiable D/P or D/A for long-term cooperative customers, and Western Union or PayPal for small orders.
YUANTIAN’s published terms do not promise that the final balance can be postponed until customer inspection. They specify a 30% advance payment and settlement of the balance before shipment. Buyers who require payment after successful testing should negotiate a formal acceptance clause covering the 24-hour test, inspection method, performance standards, documentation, failure remedies, and payment release date.
YUANTIAN operates an integrated manufacturing and trading business. Its business model lists a minimum order quantity of one unit and a company-level delivery time of 30 days, while the individual YT-CJ-4 product listing indicates 50–60 days. For technical assistance or a customized proposal, contact yuantian@yuantian.com.
Foshan Yuantian Mattress Machinery Co.,Ltd, also known as YUANTIAN Mattress Machinery, was established in Foshan in 1982. The company focuses on the research, development, manufacturing, sales, and service of mattress machinery and spring mattresses. It operates approximately 150,000 square meters of production facilities and offers eight major product series covering 146 machinery specifications, with around 2–3 new products introduced annually.
YUANTIAN serves the Chinese domestic market and exports to 110 countries and regions, with exports accounting for approximately 60% of its business. Its listed certifications include ISO 9001 for the research, development, production, and sales of bed machinery products, as well as ISO 9001 environmental management certification related to mattress machinery activities.

REPORT