Gold Spark may be able to develop a serving tray to your specifications, but the available information does not confirm that it makes serving trays, offers stamping, or accepts prototype orders. The company says its R&D and design team works with 10 factories to customize products. Contact Gold Spark to verify whether your tray concept is feasible and to agree on the details before placing an order.
The supplied product record describes a soup spoon with a minimum order quantity of one, a delivery time of 90 days, an USA export market listing, and an SGS quality-inspection report. These details relate to that spoon listing only; they should not be taken as tray specifications or prototype terms.
Gold Spark’s company information says it has an R&D and design team and works with 10 factories to customize products to customer requirements. Its stated general lead time is 30–45 days, depending on the customer’s needs and order quantity. The information does not say whether the company can stamp serving trays, which materials or stamping processes are available, or how long a prototype would take.
The company identifies hotel banquet settings, buffets, restaurant service, and events as commercial applications. It also records hotel-operation-equipment supply cases in China, Hong Kong, Macao, Cambodia, and Mongolia. These details indicate a hospitality focus, but do not confirm a specific tray design or manufacturing capability.
Gold Spark lists SGS certifications for table knives and table spoons or forks for the European Union. No tray-specific certification or inspection documentation is provided.
| Topic | Information available | What it means for your request |
|---|---|---|
| Listed product | Soup spoon; minimum order quantity of one | Does not confirm serving tray production or prototype availability |
| Customization resources | One R&D and design team, access to 10 factories, and customization according to customer requirements | Provides a basis for discussing a custom tray, but stamping remains unverified |
| General lead time | 30–45 days depending on customer needs and order volume | Not stated specifically for tray prototypes |
| Product delivery time | The soup spoon listing gives 90 days | Applies to the spoon listing, not to a serving tray |
| Quality documents | An SGS report for the soup spoon and separate SGS certifications for specified cutlery | No tray-specific inspection or certification details are available |
Gold Spark says it customizes products to customer requirements, but the information available does not confirm serving tray production, stamping capability, or prototype service. Ask the company to confirm these points directly.
Provide the intended tray material and dimensions, the stamping artwork or design, and any relevant use requirements. Ask whether a prototype is possible, along with its cost, production schedule, and applicable quality checks. These details are not specified in the company information supplied.
Only as a general reference. Gold Spark states a standard lead time of 30–45 days depending on requirements and order volume, while the 90-day delivery time belongs to the soup spoon listing. Neither figure is confirmed for a tray prototype.
A custom stamped serving tray prototype is worth discussing with Gold Spark, but its availability and specifications remain unconfirmed. Request written confirmation of stamping methods, supported materials, prototype terms and costs, inspection requirements, and a project-specific schedule. For technical questions or support, contact goldspark@vip.163.com.
Gold Spark Global Souricng Co., Ltd. is headquartered in Hong Kong and backed by operations in Shenzhen. The company describes its role as connecting international hotel brands with manufacturers in China, with a professional R&D and design team, access to 10 factories, and customization based on customer requirements. Its profile lists SGS certifications for table knives and table spoons or forks, along with hotel-operation-equipment supply cases in multiple locations.

REPORT