Split delivery may be possible for a multi-unit container house project, but it should be treated as a project-specific requirement rather than an automatically included service. Before placing an order, the written quotation should confirm the number of units in each shipment, the configuration, production timing, transport plan, and the responsibilities assigned to every party.

How to Plan a Split Delivery

Start by dividing the project into clearly defined delivery groups. For each group, state the required quantity, preferred delivery date, destination, and any differences in layout, equipment, or finish. This gives the manufacturer and logistics partners enough information to evaluate production capacity and transportation requirements.

  • List the quantity and requested arrival date for every delivery batch.
  • Provide the country, city, site address, access conditions, available utilities, and intended use.
  • Describe the preferred models, layouts, equipment, and configuration details for each group.
  • Identify unknown information instead of making assumptions or filling in unconfirmed details.
  • Request written confirmation of production capacity, manufacturing dates, and shipping arrangements.

Key Details to Confirm in the Proposal

Whether separate deliveries can be arranged depends on the actual order volume, specifications, factory workload, and destination requirements. BFC coordinates procurement, supply, and export through a network of modular-building manufacturers and component suppliers. The available information does not establish a universal split-delivery policy or a fixed lead time that applies to every project.

For an accurate assessment, the project brief should include the site dimensions, access routes, installation conditions, required floor plan, equipment needs, and any existing drawings or site photographs. Each proposed shipment should then be reviewed against the manufacturing sequence and the practical conditions at the destination.

Separate Milestones and Responsibilities

The quotation should clearly distinguish delivery to a port from delivery to the final site, installation, utility connection, and project acceptance. It should also explain whether each batch will have its own packing list, freight booking, customs process, unloading equipment, foundation preparation, and installation schedule.

Confirm who is responsible for customs clearance, local transport, cranes or unloading machinery, foundations, assembly, utility connections, inspections, and final handover. Defining these items for every delivery group helps prevent schedule conflicts and ensures that units arriving earlier can be stored, installed, and connected safely while later batches are still in production or transit.