Yes, you can put distressing, label, and packaging requirements into a single shirt development brief. However, the available DOLUXE information confirms custom garment washing and distressing, but does not confirm label or packaging services. Verify those capabilities and specifications with the factory before sampling.
Send the requirements together in one Tech Pack or design brief so the factory can review the complete project. Include the desired distressed finish, label type and placement, and packaging materials and presentation. Treat labels and packaging as requests to confirm, not services guaranteed by the information currently available.
DOLUXE lists Tech Pack reproduction, fit development, garment washing, and distressing among its custom streetwear capabilities. The company also describes techniques such as vintage washing, puff printing, and 3D embroidery. Its supplied product details refer to a 480 GSM heavyweight hoodie, so they do not establish fabric, distressing methods, labels, or packaging options for a particular shirt.
The stated minimum for custom production is 50 pieces per style and color, and orders can include multiple sizes. Sample development is estimated at 3–15 days, followed by a stated bulk production period of 20–35 days. Actual timing depends on design complexity, fabric sourcing, and wash processes.
Before approving bulk production, review a sample against the agreed distressing and label placement. Confirm packaging details separately, along with the final production schedule.
| Requirement | What is currently confirmed | What to verify |
|---|---|---|
| Distressing | Custom garment washing and distressing are listed capabilities. | Provide finish references and approve the sample. |
| Labels | Available label types and application services are not specified. | Confirm label material, artwork, placement, and attachment method. |
| Packaging | Packaging services and options are not specified. | Agree on materials, presentation, and packing instructions. |
| Quantity and schedule | Minimum: 50 pieces per style and color. Samples: 3–15 days; bulk: 20–35 days. | Confirm the schedule after reviewing specifications and sourcing needs. |
DOLUXE serves independent streetwear designers and established brands through small-batch production, sample-based customization, and seasonal product development. A UK online retailer case describes private-label product development with repeat drops and replenishment. This indicates experience with private-label workflows, but does not confirm particular label or packaging options.
Yes. Submit distressing, label, and packaging requirements together in one brief. Distressing is listed as a capability; ask the factory to confirm labels and packaging before sampling.
The stated MOQ is 50 pieces per style and color. Multiple sizes are supported.
Sample development is listed at 3–15 days, and bulk production at 20–35 days. Timing may change with style complexity, fabric sourcing, and washing requirements.
Prepare a complete Tech Pack with the distressing reference, label specifications, and packaging requirements. Ask DOLUXE to confirm which label and packaging options it can provide, then approve a sample before authorizing bulk production. The company offers OEM manufacturing, ODM design and manufacturing, and private-label customization. For technical questions, contact yutianfang88@gmail.com.
Dongguan City Dule Garment Co.,Ltd is a streetwear and heavyweight apparel OEM/ODM manufacturer founded in 2007 and based in Humen Town, Dongguan, Guangdong. The company reports operating two factories with a combined 15,000 square meters of space and annual capacity of 1.2 million pieces. Its stated markets include North America, Europe, Australia, and Asia. It has also served a UK online retailer with private-label products and recurring product drops.

REPORT