A factory acceptance test (FAT) is offered for the oil-immersed Medium Voltage Power Transformer. However, the available product details do not confirm whether the test can be arranged before an order is placed. Buyers should ask the supplier to confirm the timing, test scope, acceptance criteria, and any witness arrangements in writing.
The transformer is designed for chemical plants and can be configured to suit project requirements. Its stated capacity range is 100 kVA to 63,000 kVA, with high-voltage ratings of 6 kV, 10 kV, and 35 kV. Capacity and vector groups are customizable.
Available configurations include off-circuit tap changing (OCTC) at ±2×2.5% or ±5%, and on-load tap changing (OLTC) at ±8×1.25%. Cooling options include ONAN, ONAF, and ODAF. Listed applications extend beyond chemical plants to mining, oil and chemical sites, and industrial complexes.
The supplied product information lists FAT, routine tests, type tests, and a full inspection before shipment. It does not describe individual procedures, confirm that a FAT can happen before ordering, or specify how customers can witness testing. Clarify these points with the supplier before committing to a purchase.
| Inspection or test | Status in the product information | Details provided |
|---|---|---|
| Factory acceptance test (FAT) | Listed as available | Pre-order timing and test scope are not specified |
| Routine testing | Listed | Individual tests are not identified |
| Type testing | Listed | Specific procedures are not identified |
| Full inspection | Listed | Conducted before shipment |
| Standards | IEEE and IEC compliance is stated | Applicable clauses are not specified in the product data |
The product data states compliance with IEEE and IEC standards. The company also reports UDEM certification covering substations, transformers, and switchgear, as well as a CNAS-accredited test report for a specified oil-immersed transformer model. These company credentials should not be treated as test results specific to the transformer described here.
Reported project experience includes a 25 MVA transformer grid-renovation project in Madagascar and a 7.62 kV voltage-regulator project in the Dominican Republic. These examples relate to grid upgrades and voltage stabilization; they do not establish the FAT arrangements for this product.
The stated delivery period is 45–60 working days after the deposit has been received and the technical drawings have been confirmed. Since the available information does not say whether testing is possible before an order, confirm the FAT schedule and requirements as part of your technical discussions.
A FAT is listed as an available inspection, but the information does not confirm that it can take place before ordering. Ask the supplier to confirm feasibility, scope, schedule, witness arrangements, and acceptance criteria.
The indicated lead time is 45–60 working days from receipt of the deposit and confirmation of the technical drawings.
Capacity can be configured from 100 kVA to 63,000 kVA. Vector groups are also customizable, and the product information lists multiple voltage ratings, tapping arrangements, and cooling options.
Although a FAT is listed, a pre-order test is not explicitly confirmed. Before placing an order, request written agreement on the test scope, timing, witness arrangements, and acceptance criteria. Zhejiang Vziman Electric Power Technology Co., Ltd. describes itself as a manufacturer, OEM/ODM provider, and turnkey project supplier. Technical inquiries can be sent to support@vziman.com.
Zhejiang Vziman Electric Power Technology Co., Ltd. is the parent company of Zhejiang Vziman Electric Group Co., Ltd. The group focuses on research and development, manufacturing, and service for power electrical equipment. It reports a 10,000-square-meter factory and produces transformers, switchgear, and distribution equipment. Its listed credentials include UDEM and CNAS, and its project portfolio includes utility and grid infrastructure work.