If your CNC components have not shipped after you paid the balance, first establish the order’s current status and the schedule agreed for your specific purchase. The published terms do not promise an automatic refund, delay penalty, or compensation. Request a written update from the supplier and refer to your purchase agreement before deciding what remedy to seek.
The listed T/T payment arrangement calls for a 30% deposit before production and the remaining 70% before shipment. It does not say that dispatch will happen immediately after the balance is received, nor does it set a specific number of days between final payment and shipment.
To determine whether the order is overdue, check the lead time recorded for the product and quantity you purchased. Dream Industry lists 3–7 days for samples, 7–15 days for standard orders, and 15–30 days for mass production. Mass-production timing can vary with order size and product complexity. A separate product listing gives folding handles a 10–25 day delivery window, so confirm whether that schedule applies to your order.
Ask which production and inspection stages have been completed and whether any remaining work is holding up dispatch. Dream Industry describes checks for raw materials, production, semi-finished goods, surface treatment, assembly, finished products, and packaging. It also reports an ISO 9001-certified manufacturing system, 23 inspection procedures, dimensional accuracy up to ±0.03 mm, and a defect rate below 0.3%. These describe quality controls; they are not stated delivery guarantees.
The company reports more than 100 production and inspection units, over 80% of which are highly automated CNC machining centers, CNC lathes, and laser welding equipment. Its published lead-time ranges remain 7–15 days for standard orders and 15–30 days for mass production, subject to the order’s scope and complexity.
Published project examples include 8,000 valve handwheels supplied to a US industrial valve manufacturer, which commented on dimensional consistency and protective packaging. A German food machinery manufacturer ordered 450 stainless steel handwheels and reported fast delivery. These examples provide context about previous projects but do not establish a schedule for another customer’s CNC components.
| Area | Published information | What to verify with the supplier |
|---|---|---|
| Final payment | T/T terms describe a 30% deposit before production and a 70% balance before shipment. | Confirm receipt of funds and whether shipment has been booked. No dispatch deadline after payment is specified. |
| Lead time | Samples: 3–7 days; standard orders: 7–15 days; mass production: 15–30 days, depending on quantity and complexity. Folding handles are listed at 10–25 days. | Identify the schedule that applies to your product and order documents. Request a revised dispatch date if that schedule has passed. |
| Freight options | Listed options include DHL, UPS, FedEx, air freight, sea freight, railway, and truck transportation. | Check the selected service, booking status, and tracking details. Transit times are not provided in the supplied information. |
| Delay remedies | No automatic refund, penalty, or compensation for a delay after balance payment is stated. | Check your purchase agreement and get any revised schedule or remedy confirmed in writing. |
No immediate dispatch timeframe is stated. The listed T/T terms place the 70% balance before shipment. Ask the supplier to confirm whether the goods are ready and when dispatch is expected.
Use the schedule in your order confirmation. Published examples include 7–15 days for standard orders and 15–30 days for mass production, while folding handles have a separate 10–25 day listing. Confirm which category applies to your product and quantity.
The supplied terms do not set a delay-based refund or compensation policy. Express services and air freight are among the listed shipping options, but any shipping change, extra cost, or other remedy should be agreed with the supplier in writing.
Keep your payment confirmation and order documents together, check the agreed lead time, and ask for a written status report with a revised dispatch date. Dream Industry lists OEM and ODM manufacturing, custom CNC machining, factory-direct supply, bulk production, and flexible small-batch orders; these services do not specify compensation for delays. For order or technical support, contact Dream Industry at 86-15868979792.
Zhejiang Dream Industry Limited designs and manufactures custom precision CNC-machined parts and assemblies using stainless steel, aluminum, brass, copper, carbon steel, and engineering plastics. Established in 2008, the company offers design review, CNC turning and milling, surface treatment, precision casting, and final inspection. It reports more than 100 production and inspection units, with over 80% described as automated CNC equipment. The company lists ISO certification and patent certification No. 23542824, and serves customers across multiple industries.