For this cutlery set, sample preparation and shipment are stated to take 3–7 days after the sample fee has been received. This sample-stage estimate is separate from the standard production lead time of 30–40 days. Approval may take longer if product details need to be changed or confirmed.
The 3–7-day estimate applies to sample orders and trial orders valued under USD 1,000. It begins after payment of the sample fee. By contrast, the listed 30–40 days refers to standard product order production; the available information does not say that this period includes sampling.
For planning purposes, settle the sample specifications and approval before moving into production. The minimum order quantity is 2,000 sets per color.
The set combines 430 or 410 stainless steel spoons and forks with 420 stainless steel knife blades. Handles are made from food-grade PP or ABS. Construction features include a half-tang stamped design, a metal bolster connection, an injection-molded one-piece handle, and a mirror-polished finish.
Customization options include a laser-engraved logo and color-box or blister packaging. Before requesting approval, confirm the steel and handle materials, handle color, finish, logo artwork, and packaging choice. If any agreed detail changes, another review may be needed. No fixed duration for revisions is provided.
The company states that it conducts 100% in-house inspection and can arrange third-party inspection through SGS, TÜV, or BV. Its company profile lists BSCI, ISO9001, and ISO14001 certifications, and describes quality checks from incoming materials through finished-product sampling. These quality measures do not specify how long sample approval or revisions will take.
Approval is relevant for both retail and hospitality orders. Listed application areas include chain supermarkets and homeware and daily-necessities retailers. The company also cites European discount retailers and home-goods businesses among its cooperation cases.
| Stage or item | Information available | Confirm before proceeding |
|---|---|---|
| Sample preparation and shipment | 3–7 days after sample-fee receipt | Payment and complete sample specifications |
| Materials and construction | Stainless steel components, PP or ABS handle, half-tang construction, mirror polish | Steel grades, handle material and color, construction, and finish |
| Logo and packaging | Laser logo and customized color-box or blister packaging are available | Approved artwork and packaging format |
| Inspection | 100% in-house inspection; SGS, TÜV, or BV inspection supported | Whether independent inspection is needed |
| Production order | 30–40-day standard lead time; MOQ of 2,000 sets per color | Order quantity and final sample approval |
Sample preparation and shipment are stated to take 3–7 days once the sample fee has been received.
Unsettled choices or requested changes to materials, handle color, logo, surface finish, or packaging can lead to another review. No specific revision turnaround is listed.
The product information gives sampling and production as separate timelines: 3–7 days for the sample service and 30–40 days for standard production. It does not state that sampling is included in production lead time.
Allow 3–7 days for the sample stage after the fee is paid, then plan for the stated 30–40-day standard production period once specifications and approval are complete. Confirm materials, color, logo, finish, and packaging together to limit avoidable review rounds. The factory offers direct supply, OEM/ODM customization, and spot wholesale, and reports monthly capacity of 5 million pieces. For product inquiries, contact eyas2018@126.com.
JIEYANG CITY HUAQIANG METAL INDUSTRY CO., LTD. produces stainless steel tableware and kitchenware in Jieyang, Guangdong, and reports 40 years of industry experience. Its 16,000-square-meter facilities include production lines, automated equipment, and an in-house mold workshop. The company lists BSCI, ISO9001, and ISO14001 certifications and serves clients in multiple industries.

REPORT