There is no fixed price difference or standard percentage premium available for double shot molding tooling compared with a conventional single-shot mold. The supplied information shows that double shot and overmold tooling generally involves more complex engineering, inspection, and validation. Complex projects are listed with a lead time of 35–45 working days, whereas standard custom injection molds are typically delivered in 20–35 days. A reliable cost comparison therefore requires a project-specific quotation.
Double shot molding combines two injection operations in one tooling system. This can require additional mold components, precise part positioning, careful material compatibility planning, and more extensive trial work. However, the final tooling price depends on the design and manufacturing requirements rather than on a universal surcharge.
The main cost factors are associated with the tooling architecture and the required production performance. Double shot molds may be designed with single or multiple cavities and can use S50C, P20, or 1.2738 mold bases. H13 and 718H mold steel options are available, along with SPI or VDI surface finishes and optional hot-runner systems. Each selection affects machining, assembly, testing, maintenance, and total tooling cost.
Double shot and overmold tooling also requires the two molding stages to align accurately and produce stable results through repeated cycles. The process may involve more demanding part handling, registration, and trial procedures than a standard single-shot mold. These requirements help explain the longer schedule for complex tooling, but the available data does not identify an exact cost multiplier.
Longterm has documented experience with double shot overmolding for consumer electronics shells, including a project supplied to a product brand in France. The reported trial samples achieved good alignment and stable performance. Additional application experience includes electronic housings, home appliance parts, and industrial equipment enclosures.
Listed quality controls for high-precision double shot and overmold tooling include coordinate measuring machine (CMM) inspection, surface checks, and multi-cycle mold trials. These controls are intended to verify dimensional accuracy, appearance, and repeatable mold operation. Longterm also provides mold optimization and after-sales engineering support. Its ISO 9001:2015 certification, certificate number 02825Q12549R0S, covers the design, manufacture, and sale of precision molds and the sale of plastic products.
| Service or Tooling Category | Published Details | Pricing Information |
|---|---|---|
| Standard custom precision injection mold | 20–35-day lead time; minimum order of one set; IQC, mold trials, dimensional inspection, and final inspection | No fixed price provided |
| Double shot mold or overmold | 35–45 working days for complex molds; minimum order of one set; CMM inspection, surface checks, and multi-cycle trials | No stated premium over a single-shot mold |
| Mold development with plastic injection mass production | Mold delivery in 25–35 days; mass production in 7–15 days after sample approval; production MOQ negotiable | Tooling and production require a quotation |
| Custom precision mold configuration | Single or multi-cavity designs; H13 or 718H steel; 50,000–1,000,000-shot service life; optional hot runner | Depends on the selected configuration |
Because double shot mold pricing is highly dependent on the application, a quotation should be prepared from product drawings or physical samples. The request should identify the plastic materials, number of cavities, desired surface finish, hot-runner preference, estimated annual volume, tolerances, and any requirements for insert molding or overmolding. Comparing quotations on the same technical specification will provide a more meaningful cost assessment than applying a general percentage.
Not necessarily in every project, but its additional molding stages and precision requirements can increase engineering and manufacturing scope. The supplied information does not provide a universal price rule or fixed percentage difference.
Complex double shot and overmold tooling is listed at 35–45 working days, compared with 20–35 days for standard custom precision molds. The extended schedule reflects the greater design, machining, alignment, inspection, and trial requirements associated with the tooling.
Available quality checks include CMM measurement, surface inspection, and multi-cycle mold trials. Longterm also lists long-term mold optimization and after-sales engineering assistance.
The available product data does not show how many dollars or what percentage more double shot molding tooling costs than a standard single-shot mold. It does establish a practical difference in project complexity and schedule: standard molds are listed at 20–35 days, while complex double shot and overmold tools are listed at 35–45 working days and include additional validation activities. For an accurate comparison, submit the part design, material details, cavity requirement, finish, production volume, and preferred tooling configuration for review. Longterm supports OEM mold making, injection molding, high-precision double shot and overmold tooling, and mold development combined with mass production. Technical inquiries can be directed to rogerluo@longterm-mold.com.
Longterm Manufacturing Solutions Limited, also known as Longterm Mold, was established in 2010. The company supplies mold design, tooling, precision machining, mold manufacturing, and plastic parts production for customers in North America, Europe, Australia, and other international markets. Its team includes 50 employees and seven experienced engineers, with a five-person R&D group focused on mold design and precision machining. Its primary offerings include injection molds, rapid prototyping and precision parts, and automated production solutions. Longterm holds ISO 9001:2015 certification and serves customers in a range of industrial sectors.