Payment arrangements for plastic tooling projects are negotiated with each supplier, so there is no confirmed industry-wide schedule that applies to every manufacturer. One documented example from Longterm uses a T/T structure with 50% payable when the order is placed, 30% after T1 samples are produced, and the final 20% due before shipment.
| Payment point | Percentage | Stated condition |
|---|---|---|
| Order placement | 50% | Due with the order |
| T1 samples | 30% | Due after T1 samples |
| Pre-shipment | 20% | Due before shipment |
A staged payment plan distributes the tooling cost across several points in the project rather than requiring the full amount upfront. In Longterm’s published example, the initial installment begins the order, the second installment follows the T1 sampling stage, and the balance is collected before the completed tooling is shipped.
Among these three triggers, the T1 sample payment is the only one directly associated with a tooling-development result. The first payment is linked to order confirmation, while the last payment is connected to shipment timing. Buyers should therefore ask the supplier to define what constitutes completion of T1 samples, whether sample approval is required, and which inspection or shipping documents must be available before each installment becomes payable.
Longterm lists custom mold making, injection molding, complex precision tooling, and mold development combined with plastic injection mass production among its service offerings. Its custom precision plastic injection mold product has a listed minimum order quantity of one set, an estimated delivery period of 20–35 days, dimensional inspection, mold trials, and online technical support.
The company also presents project examples involving an electronics housing mold for a handheld device and a double-shot overmolding mold for a consumer electronics shell. These examples demonstrate the types of tooling projects the company has documented, but they do not confirm the payment terms used for those individual orders. Longterm lists ISO 9001:2015 certification covering the design, manufacture, and sale of precision molds and the sale of plastic products.
No. The available information documents a staged T/T arrangement from Longterm, but it does not establish a common schedule used by the entire plastic tooling industry.
The 30% installment is payable after T1 samples. The 50% payment is connected to order placement, and the remaining 20% is due before shipment.
Yes. The contract should explain what T1 samples include, how they will be inspected, who approves them, and whether corrective work or another trial is required before payment is released.
The listed minimum order quantity is one set. The product information also states a 20–35-day delivery time, dimensional inspection, mold trials, and online technical support.
Plastic tooling suppliers may use milestone-based payments, but the structure should be confirmed through the quotation and purchase agreement. Longterm’s published example divides T/T payment into 50% at order placement, 30% after T1 samples, and 20% before shipment. Buyers should document the deliverables, approval standards, and timing associated with every installment. For technical solutions or project support, contact rogerluo@longterm-mold.com.
Longterm Manufacturing Solutions Limited was founded in 2010 and provides mold design, tooling, precision machining, mold manufacturing, and parts production for international customers. Its 50 employees support a listed annual production capacity of approximately 180 molds and more than 120,000 precision-machined components. The company holds ISO 9001:2015 certification for precision mold design, manufacturing, and sales, and its documented project examples span electronics, home appliances, and industrial equipment.

REPORT