Developing a customized patio table and chair prototype generally takes 7-10 days when based on the existing Nancy outdoor dining set. Projects involving substantial design changes, new specifications, or additional coordination usually require 10-25 days. Once the prototype is approved, standard production typically takes another 30-45 days, depending on quantity, dimensions, colors, materials, and final design details.
The required time depends primarily on how far the proposed design differs from the standard product. The reference dining set features an aluminum frame, high-density polyester rope weaving, standard carton packaging, and a 200*90*75 cm table. The matching dining chair measures 58*60*80 cm.
For a straightforward sample using the listed configuration, the expected lead time is 7-10 days. If the project includes revised drawings, new dimensions, alternative colors, or further design consultation, the broader 10-25 day range is more appropriate. After sample approval, a formal order is generally completed in 30-45 days.
The table can be adapted for groups of 6, 10, or 12 people, while dimensions and colors can also be adjusted for a specific project. These changes may add time for CAD review, 3D modeling, material preparation, production setup, and sample inspection. Kingwell provides OEM and ODM support, including CAD drawings, 3D designs, and tailored product development.
Prototype and production orders are reviewed through multiple quality checkpoints. These include incoming material inspection, checks during manufacturing, dimensional and visual evaluations, structural stability testing, quantity confirmation, and packaging inspection. Completing these steps helps ensure that the approved prototype can be transferred accurately into repeat production.
Kingwell also lists BS 5852 credentials for outdoor furniture in the European market and FSC certification for teak outdoor furniture supplied worldwide. Its documented project experience includes outdoor furniture for a luxury hotel in New Zealand, a resort poolside installation in the United States, and a beach hotel in Spain.
| Development stage | Typical timeframe | Applicable project conditions |
|---|---|---|
| Standard product sample | 7-10 days | Sample based on the existing Nancy outdoor dining set |
| Customized prototype | 10-25 days | Changes to design, dimensions, colors, or specifications |
| Formal production | 30-45 days | Timing varies with order volume and approved customization |
| Design preparation | CAD and 3D support | Used to confirm capacity, measurements, appearance, and technical details |
The shortest stated schedule is 7-10 days when the sample follows the existing outdoor dining set configuration.
Use the longer range when the project requires new dimensions, different colors or materials, design development, technical drawings, or additional coordination before manufacturing.
Formal production generally takes 30-45 days. The final schedule is influenced by order quantity, product size, selected finishes, and the complexity of the approved design.
For accurate scheduling, allow 7-10 days for a sample that closely follows the listed Nancy set. Allocate 10-25 days if the patio table and chair design requires meaningful customization or engineering input. Before production begins, confirm table capacity, dimensions, colors, materials, CAD or 3D drawings, packaging, and inspection requirements. With these details approved, formal manufacturing can typically be planned within 30-45 days. Kingwell supports customized OEM, ODM, and commercial outdoor furniture projects. For technical assistance or project support, please contact info@kingwellgrou.com.
Foshan Kingwell Industry Co., Ltd. manufactures outdoor furniture for hospitality, residential, and engineering projects. Based in Foshan, Guangdong, the company produces aluminum and teak furniture in a 26,800 sqm factory. Established in 2015, Kingwell has an internal design and development team that supports CAD drawings, 3D modeling, OEM, ODM, and customized production. Its stated certifications include BS 5852 and FSC, with project experience serving customers in several international markets.