For the standard Double Layer Automatic Tape Edge Machine YT-WB-6, the expected production lead time is 60 days. The minimum order is one machine, making the equipment suitable for both established mattress manufacturers and production-line expansion projects. This product-specific schedule should be used for planning, rather than the company-wide 30-day delivery reference, and should be reconfirmed with production and shipping teams before an order is finalized.
The 60-day schedule applies to the standard YT-WB-6 configuration. The machine is rated for 160 pieces per 8 hours, has a total power requirement of 13 kW, and can process mattresses from 50 to 450 mm thick. Its overall dimensions are 22,000 x 4,000 x 1,500 mm, so factory layout and transport access should be reviewed during the planning stage.
Although Foshan Yuantian Mattress Machinery Co., Ltd. indicates a general 30-day delivery reference for its wider industry-and-trade operations, that figure does not replace the schedule shown for a particular product. For a standard YT-WB-6 order, the 60-day product listing is the more relevant lead-time basis. The final timeline may also depend on configuration confirmation, payment, inspection, export preparation, and the destination.
Quality and shipment preparation are incorporated into the delivery process. Incoming inspections cover steel, electrical items, and transmission components. Important parts undergo three-stage testing, while every completed machine receives a 24-hour no-load and load test. Export units are checked for corrosion protection, moisture resistance, and shipping suitability, then packed in fumigated wooden cases for customs and overseas transport.
| Planning Category | Available Information |
|---|---|
| YT-WB-6 product lead time | 60 days for the Double Layer Automatic Tape Edge Machine |
| General company delivery reference | 30 days for the broader industry-and-trade business model |
| Minimum purchase quantity | One machine |
| Stated output | 160 pieces per 8 hours |
| Standard sea shipment | FCL or LCL container transport with fumigated export packaging |
| Urgent logistics support | Air freight for spare parts and smaller machines when required |
Yes. The product record specifies a minimum order quantity of one unit and identifies 60 days as the delivery time for the Double Layer Automatic Tape Edge Machine YT-WB-6.
The 30-day period describes the company’s general business delivery reference. The 60-day period is tied directly to the YT-WB-6 listing and should therefore be used when preparing a production and installation schedule for this model.
Yuantian offers factory-layout and capacity guidance before purchase, professional installation and commissioning, operating and maintenance instruction, multilingual manuals, and 24-hour remote support. Complete machines also include a one-year free global warranty, excluding wearing parts.
Buyers planning to purchase a standard YT-WB-6 should allow approximately 60 days for production before adding the required ocean, air, land, or multimodal transportation time. The machine is available from a minimum quantity of one, and payment methods may include T/T, L/C, negotiable D/P and D/A for long-term customers, Western Union, and PayPal for small orders. To confirm the current production slot, technical configuration, shipping plan, or service requirements, contact yuantian@yuantian.com.
Foshan Yuantian Mattress Machinery Co.,Ltd, operating under the YUANTIAN Mattress Machinery brand, was established in Foshan in 1982. The company focuses on the research, development, manufacture, sales, and service of mattress machinery and spring mattresses. Its 150,000-square-meter production base supports eight major product series and 146 mattress machinery specifications, with two to three new products introduced annually. Yuantian serves the domestic Chinese market and exports to 110 countries and regions, with exports accounting for 60% of its business. Its certifications include ISO 9001 coverage for mattress machinery production and associated environmental management activities.

REPORT