When planning a custom order of Pilates or yoga grip socks, build in time for both sampling and production. The listed estimate is 7–10 business days for a sample, then 15–25 business days for bulk production once the sample is approved and the deposit is paid. Repeat orders are estimated at 10–20 business days, depending on quantity. No separate peak-season timeline is published, so confirm current capacity and dates before committing to a delivery schedule.
| Order stage | Estimated time | Notes |
|---|---|---|
| Sample production | 7–10 business days | Completed before bulk production |
| First bulk production run | 15–25 business days | Starts after sample approval and deposit |
| Repeat production | 10–20 business days | Varies with order quantity |
| Shipping | Not specified | Depends on destination and shipping method |
Seasonal workload may affect production availability, but the product information does not state a specific busy-season surcharge in days. Material availability, order volume, and the requested customization can also influence timing. For a reliable delivery plan, ask for a schedule based on your specifications and destination before placing the order.
The socks are cotton-rich, ribbed, mid-calf designs with an elastic cuff and satin ribbon bow. Custom options include material composition, grip-dot material and pattern, sock shape and color, sizing, logos, and private labels. They are intended for Pilates and yoga studios, sports teams, corporate promotions, and fashion retailers.
Yiwu Genke Apparel Co., Ltd. reports operating eight production lines with a monthly capacity of up to 1,000,000 pairs. Its company profile describes in-house oversight from yarn selection through final inspection, and the product listing states that each pair receives 100% manual inspection. OEKO-TEX 100 and BSCI are listed as company credentials; they should not be interpreted as product-specific certifications.
A company case study mentions 3–7 day rapid prototyping for certain US fitness studio, team, corporate, and retail projects. For this ribbon-bow grip sock, however, the applicable product listing gives a sample estimate of 7–10 business days.
Plan for 7–10 business days to produce the sample, followed by 15–25 business days for bulk production after approval and deposit. Shipping is additional, and its duration is not listed.
No separate busy-season estimate is provided. Because seasonal production schedules can affect availability, confirm the current production calendar before ordering.
They can. Quantity, material availability, and customization requirements may change the schedule. Discuss grip design, colors, sizing, branding, and labeling details when requesting a production estimate.
Use the listed sample and production ranges as a starting point, not a guaranteed delivery date. For peak-season orders, confirm timing for the exact quantity and specifications, and allow additional time for shipping based on the destination and service selected. For production details or technical support, contact happygu@cnleyoyo.com.
Yiwu Genke Apparel Co., Ltd. supplies custom socks for international clients across sports, advertising, yoga and Pilates, business, and fashion markets. Founded in 2016, the company reports a 1,200 sqm factory and annual production capacity of 12 million pairs. Its listed credentials include OEKO-TEX 100 and BSCI, and its case information describes work with fitness, sports, corporate marketing, and retail clients.

REPORT