When buying a Double-end Saw from overseas, reduce payment misunderstandings by documenting the full transaction before sending a deposit. The contract and pro forma invoice should identify the machine and included items, total price, payment dates, inspection expectations, shipping term, and documents required for release.
Foshan Sun Hunt lists a T/T arrangement described as a 30% deposit followed by a 70% balance before loading. However, the same payment entry is headed “100% payment by T/T.” Ask the seller to resolve this inconsistency and put the agreed schedule in the signed documents.
In addition to T/T, the company lists sight L/C and a combination of T/T and L/C. The available information does not set out the documentary requirements, fees, or timing for either L/C option. Confirm these details with the seller and the issuing bank, and state in the contract which documents and conditions trigger each payment.
Shipping terms determine how freight, insurance, export procedures, and destination expenses are allocated. Foshan Sun Hunt lists sea freight and EXW, FOB, CIF, and DDP terms. Specify the named port or delivery address and identify the party responsible for each cost and handover in the contract.
The company reports testing machines and conducting a separate pre-shipment inspection before container loading. Its stated T/T description nevertheless makes the 70% balance payable before loading, and the available information does not say that payment is conditional on inspection.
If you want the balance to depend on inspection, write that requirement into the agreement. Define the checks to be performed, the inspection evidence to be supplied, and the event that makes the balance payable. This avoids relying on an assumption that the inspection automatically changes the payment schedule.
| Method or term | Information provided | Confirm before committing |
|---|---|---|
| T/T | The description gives a 30% deposit and 70% balance before loading, while the heading says “100% payment by T/T.” | Resolve the conflicting wording and record amounts and due dates. |
| Sight L/C | Listed as an available payment method. | Agree documents, presentation conditions, fees, and timing with the seller and bank. |
| Combined T/T and L/C | Listed as an option, without a detailed schedule. | Specify the portion paid by each method and the release conditions. |
| EXW | Factory preparation is indicated; later transport arrangements are generally for the buyer unless agreed otherwise. | Confirm loading, export clearance, and transport responsibilities. |
| FOB | The seller delivers on board the nominated vessel and handles export formalities. | Name the port and clarify the handover point and onward costs. |
| CIF or DDP | CIF covers cost, ocean freight, and minimum cargo insurance to the destination port. DDP is described as delivery to the buyer’s designated destination with clearance and transport arrangements. | Confirm destination, included charges, insurance scope, and local responsibilities. |
Foshan Sun Hunt reports supplying a 19-machine production line to a wooden door factory in India and a 10-machine wood-processing line in the UAE. These examples involve production-line projects, but the supplied information does not state which payment terms applied to those orders.
The company accepts orders from one set and gives a normal delivery period of 20–35 days for its business model. Ask for the lead time that applies to your specific Double-end Saw, along with the agreed shipping schedule. For technical or order support, contact Vincent Guo at vincent@fsshmachine.cn.
That schedule appears in the T/T description, but its heading also states “100% payment by T/T.” Obtain a corrected invoice and contract confirming the agreed terms before transferring money.
No comparative assessment or detailed L/C procedure is provided. The option is listed, but its conditions and costs should be reviewed with the bank and documented in the contract.
The company describes a pre-shipment inspection before container loading, while the listed T/T description says the balance is due before loading. It does not state that inspection is a payment condition. Agree in writing on the inspection evidence and payment trigger if you require this arrangement.
Before paying a deposit, make sure the contract connects each payment to a clear date or agreed event and assigns shipping responsibilities under the selected term. In particular, reconcile the conflicting T/T wording. If choosing sight L/C or a combined method, have the seller and bank confirm all documentary and fee details. Clarify the inspection process, delivery lead time, and destination charges for the specific order as well.
Foshan Sun Hunt Woodworking Machinery Co.,Ltd. is based in Lunjiao Town, Shunde District, Foshan City. The company develops and manufactures woodworking machinery for a range of processing requirements. It reports production capacity of 50 medium-sized machines per month, with key markets in the Middle East, North America, and Africa, and has supplied production-line equipment to customers in India and the UAE.

REPORT