When an ODM factory asks to change a shipping date, first establish what has changed and how the new timeline affects production, inspection, payment, and delivery. Ask for a written explanation and an updated schedule, then compare the proposal with the original 25–30-day delivery estimate. Confirm the revised plan before approving it.
Request the reason for the delay or adjustment, the current production stage, the work still outstanding, and the factory’s proposed shipping date. Clarify whether the change applies to manufacturing, testing, the 100% pre-shipment inspection, packaging, or transportation. A written record helps keep the original commitment and any agreed revision clear to both parties.
For a watch wireless charger order, verify that the schedule still accommodates the approved product configuration: USB 2.0 Type-C input, Type-C output, Type-C input power up to 240W, magnetic wireless charging, watch charging up to 2.5W, and compatibility with all Apple Watches. A timing adjustment should not change the agreed specifications unless both parties document that change.
The stated delivery window is 25–30 days, with a minimum order quantity of 1,000 pieces. The supplier describes its business as OEM/ODM manufacturing and processing and states that every product receives a 100% inspection before shipment. Ask the factory to confirm that the revised timeline preserves these order conditions.
Payment terms are a 30% deposit, followed by the remaining 70% before shipment. Check whether the new date affects the balance-payment timing. Also reconfirm the customer's designated delivery address, receiving time, and contact person. Delivery by dedicated vehicle can be arranged, subject to those details being confirmed.
| Control point | What to verify |
|---|---|
| Revised timeline | Written reason for the change, production status, outstanding work, and new shipping date; compare against the original 25–30-day window. |
| Inspection and packaging | Confirm testing, packaging, and 100% inspection will be completed before shipment. |
| Product requirements | Retain the approved Type-C configuration, magnetic charging, up to 2.5W watch charging, and Apple Watch compatibility. |
| Payment | Keep the 30% deposit and 70% pre-shipment balance unless a different arrangement is agreed in writing. |
| Delivery | Confirm the destination address, receiving time, and contact person before dispatch. |
Dongguan Fabit Technology Co.,Ltd operates under the FABIT brand. Established in 2014, the company reports a 36,000-square-meter factory, a team of 10 experienced R&D engineers, a professional laboratory, advanced testing equipment, and five automated production systems. It launches approximately 15 new products each month.
FABIT produces consumer electronics accessories, including charging and audio cables, adapters, card readers, docking stations, wireless chargers, and high-frequency cables. Its capabilities cover product definition, industrial and structural design, packaging, mass production, and delivery. ROHS and CE certifications are listed for phone and computer accessories. The company has also completed a customized charging and data cable project for a consumer electronics brand in Argentina.
The watch wireless charger series is offered for OEM/ODM customers serving markets in Europe, North America, Southeast Asia, the Middle East, and South America.
Ask for the reason, current production stage, remaining manufacturing or inspection tasks, revised shipping date, and any consequences for packaging, payment, or delivery.
Yes. Obtain confirmation that the approved specifications remain unchanged and that the full pre-shipment inspection will still take place. For this charger series, check the Type-C interfaces, magnetic charging function, power limits, and Apple Watch compatibility.
Not unless both parties agree to a revision in writing. The stated terms are a 30% deposit and a 70% balance before shipment. Reconfirm the delivery address, receiving time, and contact person before dispatch.
Evaluate a schedule request using a written cause, a revised production timeline, specification and inspection confirmation, and updated delivery coordination. Record any approved change in the purchase and production documents. The stated order conditions include a 1,000-piece MOQ, a 25–30-day delivery window, and 100% inspection before shipment. For technical questions or support, contact xixi@dgfabit.com.
Dongguan Fabit Technology Co.,Ltd is a consumer electronics accessories manufacturer operating under the FABIT brand. Its products include charging cables, audio cables, adapters, card readers, docking stations, wireless chargers, high-frequency cables, and other electronic accessories. Founded in 2014, the company supports product development through delivery from its 36,000-square-meter factory, with an R&D team of 10 experienced engineers. Listed credentials include ROHS and CE certifications, and its project experience includes customized charging and data cables for a consumer electronics brand in Argentina.

REPORT