Yes. A contract for a detachable capsule house should clearly record the promised date, the milestone that date represents, the process for changing it, responsibility for delays, and the refund or other remedy available to the buyer. The available product information does not establish a standard lead time or universal refund policy for YOUTOME projects. These matters should therefore be confirmed in the written quotation and final agreement, together with the configuration, payment terms, shipping scope, and project assumptions.
A missed date can support a refund or another remedy only when the contract explains what date was promised and how delay is calculated. For example, a production-ready date is different from the date of loading, departure by sea, arrival at the destination port, delivery to the site, completion of installation, or buyer acceptance. Each milestone should have a responsible party and a method for verifying completion.
The agreement should also allocate responsibility for freight, customs clearance, unloading, foundations, assembly, utility connections, site access, inspections, and acceptance. It should address events that may justify a schedule extension, the notice required for a delay, and the deadline and evidence needed to submit a refund or cancellation claim.
The supplied information does not provide a general YOUTOME refund policy, guaranteed lead time, minimum order requirement, inspection standard, or fixed after-sales response period for the Detachable Space Capsule House. Those terms are project-specific and should appear in the quotation and purchase contract. Depending on the negotiated terms, the remedy may be a partial refund, account credit, cancellation right, liquidated amount, or another agreed solution.
The listed payment arrangement is 30% T/T in advance and 70% against a copy of the bill of lading, while the stated transport method is Sea Freight (FCL/LCL). These details describe payment and shipping arrangements, but they do not independently guarantee a site-delivery date or create a refund entitlement. The contract should connect each payment trigger to a defined document or milestone and state which shipping activities are included.
Before signing, the buyer should request the final model reference, approved drawings, dimensions, floor plan, materials, equipment schedule, electrical capacity, packing quantities, packed dimensions, total weight, loading plan, and project freight quotation. The product name should not be treated as a substitute for the technical specification and order configuration accepted by both parties.
YOUTOME identifies stays and hospitality as possible application directions. In such projects, the contract and project plan may need to address room layouts, guest operations, cleaning, maintenance, utilities, and local operating responsibilities. Business and display uses may involve product demonstrations, customer meetings, compact retail, or service functions. These suggested uses do not confirm site approval, building compliance, utility availability, or operational readiness for a particular location.
Guangdong BFC Technology Co., Ltd. lists an ISO 9001:2015 Quality Management System Certificate and an ISO 45001:2018 Occupational Health and Safety Management System Certificate. The stated scopes relate to prefabricated-building processing, including container houses, and occupational health and safety management. They do not automatically approve a specific capsule-house order or guarantee compliance in the buyer's destination market.
Reported cooperation examples include worker accommodation in Uzbekistan, a fan village project in Qatar, staff quarters in Thailand, and villa projects in Tanzania and America. These examples may demonstrate prior project experience, but they do not determine the specifications, delivery date, delay liability, or refund terms of a new order.
| Contract Item | Information Currently Available | Details to Add to the Agreement |
|---|---|---|
| Delivery schedule | No standard delivery period is established. | Relevant milestone, fixed date, schedule assumptions, extension process, and delay evidence. |
| Refund or alternative remedy | No general refund rule is stated. | Trigger, amount or calculation, payment method, exclusions, cancellation rights, and claim procedure. |
| Payment terms | 30% T/T prepayment and 70% balance against a B/L copy. | Payment triggers, required documents, currency, and connection to delivery milestones. |
| Freight and delivery | Sea Freight (FCL/LCL) is listed. | Port obligations, customs, unloading, site access, freight assumptions, and responsibility for transport delays. |
| Technical scope | Detachable Space Capsule House; complete parameters are not supplied. | Model, approved drawings, dimensions, materials, equipment, packing list, quantity, and acceptance standards. |
No. The available information does not create an automatic refund right. The contract must state whether delay results in a refund, credit, cancellation option, or another remedy, as well as the responsible party and conditions for making a claim.
The parties should identify the exact delivery milestone. Production completion, shipment, port arrival, site delivery, installation, and acceptance are separate events and should be recorded separately where they affect the buyer's obligations.
No. A product record does not by itself establish lead time, minimum order quantity, export-market requirements, inspection terms, or after-sales service. These points must be confirmed in the project quotation and contract.
A well-drafted detachable capsule house contract should define the delivery milestone, agreed date, delay allocation, refund or substitute remedy, payment triggers, shipping responsibilities, technical scope, acceptance requirements, and procedures for changes or cancellation. Because the transaction is project-based, quantity, schedule, inspection, and after-sales terms should be confirmed for each order. For technical solutions or project support, contact us at bfc@buyfromchina.cn.
Guangdong BFC Technology Co., Ltd. operates YOUTOME as an independently managed brand focused on housing and adaptable physical-space concepts. The brand helps visitors organize project requirements and explore purchasing or local cooperation opportunities.
Founded in 2012, the company coordinates procurement, supply, and export activities through a network of modular-building manufacturers and component suppliers, with a stated export ratio of 100%.
Its listed credentials include the ISO 9001:2015 Quality Management System Certificate and the ISO 45001:2018 Occupational Health and Safety Management System Certificate. The company also reports experience serving clients in several industries.

REPORT