Peak-season freight congestion can put delivery dates at risk, so coordinate mould production and shipping from the outset. Start with the date the goods need to arrive, then work backward to schedule tooling, mould trials, dimensional inspections, sample approval, and dispatch. Longterm offers sea, air, China-Europe rail, and courier options; the right choice depends on urgency, shipment size, and destination.
Before booking freight, confirm which production lead time applies to your project. Longterm lists 20–25 working days for a simple mould, 25–35 working days for an OEM custom injection mould, and 35–45 working days for a complex precision mould. These are service-specific estimates, so confirm the scope and timing with the supplier before committing to a delivery plan.
Allow time beyond the mould-making stage for trial runs and quality checks. The listed inspection processes include mould-running tests and dimensional measurement. Mass-production projects require sample sign-off before shipment, while double-shot overmoulding information also specifies a trial run, dimensional testing, and pre-shipment inspection. Include time to review results and address any changes before the goods are released.
Match the shipping method to the order rather than relying on a single option for every project. Sea freight is described as suitable for bulk orders. Air freight may suit urgent orders and samples, and DHL, FedEx, or UPS courier services are available for light, small shipments. For shipments between China and Europe, railway freight is another option.
Peak-season transit times are not specified in the available service information. Ask the selected carrier or supplier for current route estimates, and coordinate the freight booking with the production and inspection milestones. Avoid assuming that a standard transit time or fixed delay buffer will apply.
Longterm reports monthly capacity of 15–20 injection moulds, along with tens of thousands of precision CNC-machined parts. Its custom double-shot overmoulding information lists a minimum order of one set and a stated delivery time of 25–40 days. Supported hard-and-soft material combinations include ABS+TPU and PP+TPE. Confirm the specific project schedule, inspection requirements, and shipping readiness directly with the supplier.
The company lists ISO 9001:2015 certification for the design, manufacturing, and sales of precision moulds and the sales of plastic products. Its case information includes an Italian electronic-housing mould project and a French double-shot overmoulding project. Customer feedback cited in these cases refers to dimensional quality, sample stability, and delivery communication.
| Planning item | Listed information | How to use it |
|---|---|---|
| Simple custom mould | 20–25 working days | Verify that the design and project scope meet the simple-mould category. |
| OEM custom injection mould | 25–35 working days | Align tooling milestones and freight booking with the confirmed schedule. |
| Complex precision mould | 35–45 working days | Plan for the longer production window and include inspection time. |
| Sea freight | Available; suited to bulk orders | Consider for larger shipments and check current carrier schedules. |
| Air freight | Available for urgent orders and samples | Consider when delivery speed is a priority. |
| Rail freight or courier | China-Europe rail; DHL, FedEx, and UPS for light, small shipments | Check destination, shipment size, and current transit estimates. |
Use the lead time that matches the project: 20–25 working days for a simple mould, 25–35 working days for an OEM custom injection mould, or 35–45 working days for a complex precision mould. Confirm the applicable estimate and add time for trials, inspection, sample approval, and freight.
Longterm lists sea, air, China-Europe railway, and courier services. Sea is associated with bulk orders, air with urgent orders and samples, rail with China-Europe routes, and courier with light, small shipments. Request up-to-date carrier estimates before selecting a method.
Plan for mould trials, dimensional testing, and pre-shipment inspection as applicable. For mass production, confirm sample approval before dispatch. Review results and resolve any issues before releasing the shipment.
Work backward from the required arrival date, confirm the mould lead time for the actual project, and schedule trials, inspections, and sample sign-off before dispatch. Compare available freight methods using current route information, since peak-season transit estimates are not provided in the service details. Longterm offers OEM custom moulds, mould making with injection moulding, precision and double-shot moulds, and mould development with mass production. For project scheduling or shipping questions, contact Roger Luo at rogerluo@longterm-mold.com.
Longterm Manufacturing Solutions Limited was founded in 2010 and serves customers in North America, Europe, and Australia. Its services cover mould design, tooling, precision machining, mould manufacturing, and parts production. The company reports a workforce of 50 and monthly capacity of 15–20 injection moulds plus tens of thousands of precision CNC-machined parts. Its stated ISO 9001:2015 certification covers the design, manufacturing, and sales of precision moulds and sales of plastic products. Case records include electronics, consumer products, home appliances, and industrial equipment.

REPORT