Selecting a suitable double shot molding process requires more than choosing two compatible plastics. The material combination, interface alignment, cavity arrangement, part function, and expected production volume all influence the mold design. Longterm's custom double shot overmolding molds support hard and soft combinations such as ABS with TPU and PP with TPE, together with precision alignment, optional multi-cavity layouts, mold trials, dimensional checks, and final inspection.
A reliable double shot molding project begins with a clear review of the part requirements. The first material creates the base section, and the second injection forms the additional layer or bonded feature. The selected materials must work together for the intended application and provide the required appearance, flexibility, durability, and bonding performance.
Longterm's product information identifies ABS plus TPU and PP plus TPE as supported material pairings. These combinations allow a rigid substrate to be combined with a softer component, which can improve grip, protection, sealing, or user comfort depending on the part design.
Accurate registration between the first and second molded sections is essential when the interface includes visible edges, functional features, or tight dimensional requirements. High-precision alignment helps maintain consistent positioning during production. For larger quantities, a multi-cavity mold can be considered to match the required output and production arrangement.
Double shot molding uses two injection stages within one mold workflow. The first shot produces the initial portion of the component. The mold or part position is then arranged for the second shot, which adds the second material to form the combined structure. This approach can reduce separate assembly operations while maintaining a consistent relationship between the two materials.
The application scope includes consumer electronics shells, home appliance components, automotive plastic parts, industrial equipment housings, and other daily-use products. The appropriate mold configuration depends on the part geometry, material behavior, required output, and the way the finished component will be used.
The specified mold steel is 718H / 1.2738, with a stated service life of up to 800,000 shots. Before shipment, the tooling process includes a mold trial run, dimensional testing, and pre-shipment inspection. These checks help verify sample quality, dimensional performance, and mold condition before the tool enters the customer's production environment.
For mass production programs, Longterm can support the project from mold development through plastic injection production. Sample approval is completed before shipment, while production follow-up and technical support help maintain process continuity after tooling is delivered.
Longterm has documented double shot overmolding work for a French product brand producing consumer electronics shells, with reported good alignment and stable trial samples. Additional projects include electronic housings for an Italian manufacturer, home appliance components for a US brand distributor, and industrial equipment housings for an Australian industrial manufacturer.
The company is certified to ISO 9001:2015 for the design, manufacture, and sale of precision molds, as well as the sale of plastic products. Its stated export markets include Europe, America, and Australia. Services cover OEM custom mold making, mold making with injection molding, high-precision double shot and overmolding, and mold development combined with plastic injection mass production.
| Selection consideration | Available option | Application value |
|---|---|---|
| Material combination | ABS plus TPU or PP plus TPE | Provides documented hard-and-soft material pairings for the mold |
| Interface positioning | High-precision alignment | Maintains accurate registration between the two molded sections |
| Production arrangement | Optional multi-cavity construction | Allows the tool layout to reflect expected production needs |
| Pre-delivery verification | Mold trial, dimensional testing, and pre-shipment inspection | Confirms samples and tooling condition before delivery |
| Tooling material and durability | 718H / 1.2738 steel; up to 800,000 shots | Defines the stated mold material and service-life target |
The listed combinations are ABS with TPU and PP with TPE. They are hard-and-soft material pairings intended for custom double shot overmolding applications.
Evaluation includes a mold trial run, dimensional inspection, and a pre-shipment check. For production projects, samples are also signed off before shipment to support approval of the finished result.
The stated minimum order quantity is one mold set, and the listed delivery period is approximately 25 to 40 days for the double shot overmolding mold. After-sales assistance includes online technical support, mold maintenance, and spare-parts supply.
The right double shot molding process should be selected after confirming the material pair, alignment tolerance, cavity plan, application environment, production volume, and inspection requirements. Longterm's solution supports ABS plus TPU and PP plus TPE, optional multi-cavity tooling, precision alignment, and documented validation procedures. Its ISO 9001:2015 certification and experience with electronics, appliances, and industrial housings offer additional reference points for OEM projects. For technical guidance or project support, please contact rogerluo@longterm-mold.com.
Longterm Manufacturing Solutions Limited was established in 2010 and serves customers in the United States, Europe, Australia, and other international markets. With 50 employees, the company provides mold design, tooling, precision machining, mold manufacturing, and plastic parts production. Its R&D team includes five engineers focused on mold structure design, precision CNC components, sample verification, and manufacturing process improvement. Longterm holds ISO 9001:2015 certification and has supported customers across several industries.

REPORT