For K-House purchases, a two-stage payment plan can provide a practical balance between production funding and shipment control. The standard approach is to pay a 50% advance deposit when the order is confirmed, followed by the remaining 50% before shipment once the factory has completed production, carried out its self-inspection, and confirmed loading readiness.
The first 50% payment is made in advance to secure the order, reserve manufacturing capacity, and authorize the factory to begin production. This milestone should be clearly connected to the confirmed product specification, quantity, and selected K-House configuration.
The final 50% balance should be paid in full before the goods leave the factory. Payment becomes due after production is finished, the applicable factory self-inspection has been completed, and the units are confirmed ready for container loading and transport.
Linking payments to these measurable production events helps buyers coordinate project budgets while allowing the supplier to schedule materials, labor, and manufacturing resources efficiently.
Payment milestones and delivery arrangements should be documented separately but consistently. The contract should state the production release point for the deposit, the pre-shipment conditions for the balance, and the planned shipping method. Available shipping information refers to 40HQ and 20FT ocean freight containers, so the order should identify the expected container type and loading arrangement.
Delivery timing must also be confirmed for the specific product selected. The industry-trade integration model records a delivery period of 15 days, while the detachable container house product record indicates a 7-day delivery time. Because lead time can depend on the model, configuration, and order details, the final schedule should be stated directly in the commercial agreement.

| Item | Recommended use in the order |
|---|---|
| Advance payment | 50% deposit paid in advance to confirm the order and start production. |
| Final payment | 50% balance paid before shipment after completion, self-inspection, and loading readiness confirmation. |
| Delivery schedule | Confirm the applicable lead time: 15 days under the business model or 7 days for the detachable container house record. |
| Minimum order quantity | 1 set. |
| Inspection | Factory self-inspection for the detachable container house product. |
| Transportation | Ocean freight using 40HQ or 20FT containers. |
| Warranty | One-year warranty for detachable container houses, excluding man-made damage. |
This payment model can be used for construction-site dormitories, project offices, field camps, emergency accommodation, post-disaster housing, tourism facilities, and rural housing developments. Since prefabricated units are often needed quickly for on-site installation and may later be relocated, production and shipping milestones are especially important for project planning.
For larger requirements involving multiple K-House units, the same structure can be applied to each production batch if batch delivery is accepted by the supplier. However, any split-delivery or batch-payment arrangement should be expressly written into the agreement. The standard recorded terms remain a 50% deposit and a 50% balance before shipment.
Guangdong Uni-House Technology Co., Ltd. holds CE certification No. 3N240819.GUTQO66 for modular container house products, including detachable and flat pack container solutions. The certification applies to markets in the EU, Australia, North America, South America, Southeast Asia, and the Middle East.
The company has also supported an Indonesian local energy company on a coal mine living-area project involving 2,000 sets of mining worker dormitories. This experience reflects its ability to support high-volume prefabricated housing procurement and deployment.
The recorded payment arrangement uses a 50% advance deposit. It should be tied to formal order confirmation and the release of production.
The remaining 50% is payable before shipment, once manufacturing is complete, factory self-inspection has been performed where applicable, and the K-House units are ready for loading.
The delivery period should match the selected product and final agreement. The business model lists 15 days, while the detachable container house information lists 7 days, so both parties should confirm the applicable schedule before finalizing the order.
A 50% deposit followed by a 50% pre-shipment balance creates a straightforward payment framework for K-House procurement. To avoid uncertainty, the order should define the production start trigger, inspection status, shipment-readiness confirmation, delivery lead time, container format, and warranty coverage. Orders can begin from 1 set, and detachable container houses include a one-year warranty excluding man-made damage. For technical solutions or further support, please contact us at guizugroup@outlook.com.
Guangdong Uni-House Technology Co., Ltd. is a foreign trade company established under the Guizu Group. Founded in 2008, it provides design, research and development, manufacturing, installation, and after-sales services through multiple factories. With a 100% export ratio, the company serves customers in Australia, the Middle East, North America, Southeast Asia, and other international markets.