Final payment for hybrid moving heads should be released only after the ordered fixtures meet documented acceptance requirements. Before production begins, define the inspection criteria, required evidence, and shipment approval process. For Color Imagination orders, the completed quality file should include functional test records, burn-in results, safety checks, final inspection findings, and authorization to ship.
A reliable process connects the confirmed purchase specification with inspection results and the final shipment decision. The checklist should be written for the exact fixture and application, then signed by the responsible parties before the balance is paid.
The product specification should state the expected optical output, beam range, wash and spot performance, color behavior, framing or shaping features where applicable, pan and tilt movement, dimming curve, strobe response, control protocol, and operating conditions. Only features confirmed in the purchase order should be treated as binding acceptance requirements.
The FSPOT 1200P product information demonstrates the level of specificity that can be used when preparing a checklist. Its listed configuration includes a 1000W white LED module, a 6°-50° motorized zoom, 540° pan, 270° tilt, CMY color mixing with linear CTO correction, a framing shutter system, rotating and static gobos, a prism, a frost filter, 0-100% dimming, and DMX512 and RDM control. These details should be matched against the confirmed model and order documentation.
Quality verification should cover incoming components, production-stage controls, optical performance, electrical safety, waterproof testing for IP-rated fixtures, burn-in operation, aging results, final inspection, and packaging. Touring, outdoor, and rental applications may also require closer checks of heat dissipation, enclosure integrity, connectors, operating noise, movement recovery, and stable performance under the agreed conditions.
For coordinated lighting projects, testing should include system-level behavior where relevant. Color Imagination describes a nightclub project in Kunming, China, that combined beam, wash, effect, and pixel lighting for synchronized visual results. This type of application calls for verification of both individual fixture operation and coordinated control response.
The stated standard payment arrangement is T/T with a 30% advance deposit and a 70% balance due before shipment. An irrevocable L/C payable at 60-90 days may be considered for long-term partners or special projects by mutual agreement. The inspection package supports the decision to authorize shipment, but it does not alter the agreed payment schedule unless both parties approve a written change.
| Project stage | Evidence and required action |
|---|---|
| Order confirmation | Verify model, quantity, functions, delivery schedule, inspection criteria, and agreed T/T or L/C terms. |
| Production monitoring | Keep records of incoming material checks, in-process inspections, optical tests, electrical safety verification, and corrective actions. |
| Pre-shipment acceptance | Complete 100% functional testing, burn-in, safety inspection, final quality review, packaging inspection, and signed shipment approval. |
| Balance payment | Release the 70% T/T balance before shipment once the agreed inspection file is complete and approved. |
| After-sales support | Use the agreed support channels for technical consultation, remote troubleshooting, firmware updates, spare parts, repair, commissioning, and training. |

Include the confirmed model and quantity, required lighting functions, control-response results, safety and electrical records, burn-in status, packaging condition, defect and retest documentation, and the authorized shipment-release sign-off.
No. Under the stated terms, the buyer pays 30% in advance and the remaining 70% before shipment. Inspection provides evidence for shipment approval; changing the payment timing requires mutual written agreement.
Color Imagination states that it offers technical assistance, remote troubleshooting, spare parts, firmware updates, repair services, project commissioning, and user training. Warranty coverage remains subject to the relevant product specifications and contract.
For each hybrid moving head order, use a signed acceptance matrix and attach all 100% functional, burn-in, safety, final inspection, packaging, defect-resolution, and shipment-approval records. Release the final payment only after the file confirms that the agreed requirements have been met. Color Imagination supports OEM/ODM production, standard products, and project solutions, with a minimum order quantity of one and a stated delivery period of 25-30 days after deposit. For technical solutions or support, please reach out to us via jack@color-imagination.com.
Guangzhou Color Imagination LED Lighting Limited, also known as Color Imagination, develops and manufactures professional lighting equipment for entertainment, architectural, television, and event applications. Founded in 2010, the company reports 130 employees and a 6000SQM manufacturing facility, along with CE and ISO certifications and OEM/ODM and technical service capabilities for clients in multiple industries.