For dependable delivery of the requested electric bus, use a 15–20-day product lead time as the main production reference. For wider project planning, retain a 15–30-day delivery window to account for configuration confirmation, inspection, documentation, and order coordination. Sea freight is the stated transport method, but the available information does not identify an Incoterm. The buyer and supplier should agree on the Incoterm, vehicle specification, inspection approval, and payment milestones before production begins.
The product is identified as the LQY148A型/D11A+3F, while its product keyword states “14seats bus.” Since the inquiry concerns an 11-seater bus, the seating arrangement must be checked against the quotation, approved technical drawings, production order, inspection report, and shipping documents. Confirming this point before manufacturing helps avoid inconsistencies in vehicle construction and export paperwork.
The stated product lead time is 15–20 days. A broader 15–30-day range is also provided under the company’s industry-and-trade integration model, with a minimum order quantity of one vehicle. The shorter period can be used when the specification is fixed and production proceeds without complications. The wider range is more suitable for a complete project schedule that includes approval, testing, and logistics preparation.
Sea freight is the only shipping method specified in the available records. No named Incoterm, such as FOB, CIF, or another delivery arrangement, is provided. Therefore, an Incoterm should not be assumed. The commercial agreement should clearly state the selected term, destination, transfer point, freight payer, export and import customs responsibilities, insurance arrangements, and any charges payable by each party.
The payment structure requires a 30% deposit, with the remaining balance payable before loading. This condition should be synchronized with the inspection schedule. The bus is subject to 100% inspection-line testing and road testing, and only vehicles that pass the required checks are approved for shipment. Buyers should connect final payment and loading authorization to documented completion and acceptance of these tests.
The vehicle uses a high-strength steel frame-type longitudinal beam with electrophoretic and powder-coating protection. Its listed design includes front MacPherson suspension, rear integral suspension, and a braking system intended to support controlled operation. These specifications make final line and road testing especially important if the requested seating configuration differs from the standard product description.
The bus is positioned for use in scenic locations, parks, and other visitor transportation environments. Langqing’s referenced projects include museum shuttle vehicles in Egypt, a municipal sanitation project in Singapore, a Cuba shuttle bus project, and an airport shuttle bus project in Argentina. These examples show experience in tourism, public-service, and transport applications, but they do not establish a particular Incoterm for this order.
The product information highlights 100% inspection-line testing and road testing. The company profile also lists CE certification for electric golf carts, electric sightseeing buses, and electric trucks in the European Union. Buyers should still confirm that the exact bus configuration, destination market, and applicable compliance documents are aligned before shipment.
| Item | Planning guidance |
|---|---|
| Product lead time | 15–20 days for the listed bus once the configuration is approved. |
| Broader delivery schedule | 15–30 days when inspection, production coordination, or documentation adds time. |
| Transport method | Sea freight; no specific Incoterm is included in the available information. |
| Payment terms | 30% deposit, followed by payment of the balance before loading. |
| Quality release | 100% inspection-line testing and road testing; only qualified units may ship. |
| Minimum order quantity | One unit. |
| Seat configuration | Must be verified because the inquiry requests 11 seats while the product keyword states 14 seats. |
Use 15–20 days as the primary production lead time for the listed product. For a more conservative project schedule, allow up to 15–30 days when configuration approval, testing, inspection, or export coordination may require additional time.
The available product data does not recommend or identify a specific Incoterm. The parties should select one in writing and define the destination, delivery point, freight allocation, customs obligations, insurance, and risk-transfer timing in the sales contract or commercial invoice.
The listing uses the keyword “14seats bus,” so an 11-seat version cannot be assumed from the available information. Confirm the requested layout with the supplier and ensure that the approved quotation, technical specification, production documents, and inspection records all show the same configuration before paying the deposit.
Build the order schedule around a 15–20-day product lead time, while keeping the wider 15–30-day range available for complete delivery planning. Arrange sea freight, but obtain a written Incoterm because none is stated in the product data. Before production, confirm the 11-seat requirement against the listed 14-seat description. Finally, link the balance-before-loading payment to successful 100% inspection-line and road testing. For technical guidance or order support, contact crystalhuang@langqing.cn.
Guangzhou Langqing Electric Car CO., LTD. was founded in Guangzhou in 2000 and operates across research and development, manufacturing, sales, and service. The company reports a production capacity of 1,000 units per month and serves customers in North America, South America, Europe, the Middle East, Africa, and Southeast Asia. Its listed credentials include CE certification, while its cooperation projects cover tourism, municipal services, and transportation applications.

REPORT