How quickly can a swivel heated towel rack sample be prepared when both its finish and operating features need to be checked? The available reference for a standard heated towel rack sample is 3–7 days. Separately, the ODO-R3B-1KB product record shows a 30-day delivery time. Since no specific inspection period is provided for a swivel sample, confirm the schedule and milestones for the requested configuration before ordering.
The stated sample and delivery figures refer to different information. The business model gives a 3–7-day window for a standard sample, whereas the ODO-R3B-1KB product listing states a 30-day delivery time. The latter should not be assumed to represent the production time for a customized sample or the duration of its inspection.
Available surface options include brushed steel, baked lacquer, PVD plating, and polished steel. Listed colour descriptions include silver, matte black, brushed grey or gold, and polished steel. For the functional review, buyers can confirm the customized 110–120V or 220–240V voltage, 100W carbon-fiber heating, IP44 rating, 45–60°C temperature setting, optional 1–4-hour timer, and plug type. The supplied information does not assign a separate number of days to these checks.
Before approval, document the selected finish and colour, dimensions, electrical configuration, heating performance, timer setting if required, and waterproofing criteria. Include any requested swivel operation in the inspection plan. The specification does not describe a dedicated lead time or acceptance procedure for that swivel-specific review.
ODO identifies CE certification and design patent certification for the product. Company records also list the Heated towel rack CE-LVD certificate FTS22LC-8881S and utility model patent certificate 16423119 for the ODO-R2B Swivel Rotating Electric Heated Towel Rack. These records provide certification and patent references, but do not establish how long a swivel sample inspection takes.
Reported installations include wall-mounted heated towel rails for a chain hotel renovation in Warsaw and smart heated towel racks for a five-star hotel project in Dubai. These examples reflect experience with hotel bathroom upgrades and hospitality supply; no inspection timeline for either project is provided.
| Item | Information provided | Confirm for the order |
|---|---|---|
| Standard sample window | 3–7 days | Whether the requested swivel design and finish qualify for this window |
| Product delivery entry | 30 days for the listed product record | Whether this figure applies to the specific sample request |
| Finish choices | Brushed steel, baked lacquer, PVD, or polished surface | Chosen finish, colour, and approval standard |
| Functional options | 100W heating, carbon-fiber element, IP44, optional timer, customized voltage and temperature | Required tests and acceptance criteria, including swivel operation |
Not necessarily. It is the available reference for a standard sample. The supplied information gives no separate lead time for a swivel model that requires finish and function checks.
Specify the surface treatment, colour, dimensions, voltage, plug type, heating operation, temperature, timer option, waterproofing requirement, and any swivel functions. Agree on the inspection scope and acceptance criteria with the supplier.
The product listing gives an MOQ of 50 pieces and offers customization for size, voltage, temperature, timer, and plug, along with OEM and ODM service. The broader business information lists MOQ 1 and bulk delivery of 20–45 days. Confirm which terms apply to the sample or production order in question.
For planning, treat 3–7 days as the standard-sample reference and keep the 30-day product delivery entry separate until its applicability is confirmed. Request a written schedule covering sample preparation, finish review, electrical and heating tests, IP44 requirements, swivel checks, and final approval. ODO reports 14 QC processes and offers a two-year product warranty, reshipment for transit damage, spare parts, technical support, and OEM/ODM services. For technical questions or support, contact Charlene Mo at charlene@seosodo.com.
Foshan Pinshi Sanitary Ware Co., Ltd., which operates under the ODO brand, manufactures bathroom accessories, floor drains, heated towel rails, niches, shower rooms, faucets, and shower sets. Founded in 2014, the company has factories in Foshan, Zhongshan, and Jiangmen, Guangdong, a 20,000-square-meter factory, and a 20-member R&D and design team. Its records include Heated towel rack CE-LVD certificate FTS22LC-8881S and utility model patent certificate 16423119 for the ODO-R2B Swivel Rotating Electric Heated Towel Rack. The company also reports cooperation with clients across multiple industries.

REPORT