All Categories

What Deposit Should You Pay Before Double-end Saw Production?

VIP-User
2026-10-19

Recommended Deposit and Payment Schedule

The payment terms provided use a 30% deposit by T/T, with the remaining 70% due by T/T before loading. This is a useful reference for a Double-end Saw order, but the available information does not set out a separate deposit policy or provide a price for this saw. Confirm the agreed order value, when the deposit is payable, and each payment milestone in the sales contract before production starts.

Key Points for Buyers

  • The stated T/T arrangement is 30% upfront and 70% before loading.
  • Since no Double-end Saw quotation is supplied, calculate the deposit from the final agreed order value.
  • Company-wide business terms list a minimum order of one set and a usual delivery window of 20–35 days. Check whether these apply to the chosen saw and production schedule.
  • The company identifies panel furniture and wood door manufacturing as application areas for its woodworking machinery. These examples do not confirm that a particular Double-end Saw configuration suits a buyer’s needs.

What the Available Information Covers

The payment details describe a deposit followed by a balance payment: 30% of the order value by T/T, then 70% by T/T before loading. They do not specify the exact event that triggers the deposit. Buyers should state in the contract whether payment is due upon order confirmation or at another agreed stage.

There is an important distinction between the supplied product details and the machine in question. The product specifications provided relate to an Edge Banding Machine with Pre-milling, Fine Trimming & Rounding—not a Double-end Saw. Its stated minimum order of two sets and 30-day delivery time should therefore not be assumed to apply to a saw. The company-wide terms indicate that orders from one set are accepted and normal delivery takes 20–35 days; obtain confirmation for the specific Double-end Saw order.

Foshan Sun Hunt Woodworking Machinery Co., Ltd. describes quality checks at several stages, including parts inspection, production-process rechecks, testing after assembly, and verification before shipment. Its management process is also described as covering sourcing, manufacturing, storage, packaging, quality control, shipment inspection, and after-sales support. These practices offer background on operations but do not alter the quoted payment schedule.

The company also reports supplying woodworking production-line equipment to overseas customers. A wood door factory in India purchased 19 machines for a new line, and a wood-processing factory in the UAE purchased 10 machines. The available information does not identify either project as a Double-end Saw sale.

Terms to Verify Before Placing an Order

TopicInformation currently availableConfirm for your Double-end Saw
T/T payments30% deposit and 70% before loadingFinal order value, deposit due date, and payment stages
Minimum orderOne set is accepted under company-wide termsWhether this applies to the selected saw model and configuration
Delivery estimateCompany-wide normal delivery is 20–35 daysOrder-specific production lead time and shipping plan
Saw specificationsThe supplied technical information is for an edge banding machineDouble-end Saw model, price, configuration, and applicable terms

Frequently Asked Questions

Is a 30% deposit reasonable for a Double-end Saw?

Thirty percent matches the T/T schedule provided, with the remaining 70% payable before loading. Because no separate Double-end Saw policy is stated, have the supplier confirm and record the terms in the order contract.

How do I work out the deposit amount?

Multiply the agreed Double-end Saw order value by 30%. The available information contains no price for this saw, so the deposit cannot be expressed as a specific currency amount until a quotation is agreed.

Can I expect the saw to be delivered in 30 days?

The 30-day delivery figure belongs to the edge banding machine information. The company-wide estimate is 20–35 days, but the lead time for a particular Double-end Saw should be confirmed directly with the supplier.

Conclusion and Next Steps

Use 30% of the agreed order value as a reference deposit, with the remaining 70% due before loading. Before production begins, put the deposit trigger, final price, machine configuration, and delivery schedule in writing. The company lists T/T and sight L/C payment options, as well as EXW, FOB, CIF, and DDP terms; confirm which are available for your transaction. For questions about the machine or payment conditions, contact Vincent Guo at vincent@fsshmachine.cn.

About the Company

Foshan Sun Hunt Woodworking Machinery Co., Ltd. is located in Lunjiao, Shunde, Foshan, and develops and manufactures woodworking machinery. The company introduction cites three decades of industry experience and an in-house, seven-part management system spanning sourcing through after-sales service. It reports annual capacity of 600 medium-sized machines and lists customers in the Middle East, North America, and Africa. Its reported projects include production-line equipment supplied to businesses in India and the UAE.

Foshan Sun Hunt Woodworking Machinery Co., Ltd. logo

REPORT

Code
Choose a different language
Current language: