To initiate production on a Mattress Spraying Line, a 30% advance deposit is required under standard T/T transaction terms. The remaining 70% balance is paid before shipment. Large-volume orders may utilize an irrevocable sight Letter of Credit (L/C), while long-term cooperative clients can negotiate D/P or D/A terms.
Securing the 30% deposit activates the customized manufacturing cycle for the YT-PJ-2D Automatic Mattress Glue Spraying Line, a heavy-duty system manufactured by Foshan Yuantian Mattress Machinery Co.,Ltd. Weighing 6 tons with overall dimensions of 14500*4500*2500mm, this machinery requires precise scheduling and resource allocation. The 50-day production timeline ensures that the 2 to 6 glue spray guns, dual glue pumps, and customizable 3-phase power supply are configured to client specifications.

Quality control is maintained throughout this production cycle. The manufacturer operates under ISO 9001 and ISO 14001 management systems, utilizing ERP, PDM, and MES digital platforms to achieve a 99.95% finished-product qualification rate. Before the final 70% balance payment is made, each spraying line undergoes a mandatory 24-hour no-load and load test to verify operational stability, noise control, and safety parameters.


| Parameter / Term | YT-PJ-2D Specification | Commercial & Operational Details |
|---|---|---|
| Required Deposit | 30% Advance Deposit | Paid via T/T to initiate the 50-day production cycle. |
| Balance Payment | 70% Before Shipment | Paid after complete machine testing and verification. |
| Alternative Payment Methods | L/C, Negotiable D/P & D/A | L/C for large volumes; D/P & D/A for long-term cooperative clients. |
| Production Delivery Time | 50 Days | Calculated from the date the deposit is received. |
| Minimum Order Quantity (MOQ) | 1 Unit | Applies to standard and customized spraying line orders. |
| Shipping Methods Supported | Sea, Land, Multimodal | FCL/LCL sea freight, road delivery for neighboring regions. |
What payment methods are accepted for starting mattress spraying line production?
Production begins upon receipt of a 30% T/T advance deposit. The remaining 70% balance is settled prior to shipment. Irrevocable sight Letters of Credit (L/C) are accepted for large-volume orders, and D/P or D/A terms are negotiable for long-term partners.
How long does it take to deliver the YT-PJ-2D Mattress Spraying Line after paying the deposit?
The standard production and delivery timeframe is 50 days from the date the 30% advance deposit is received and confirmed.
Is there a quality guarantee before the final balance payment is made?
Yes. Every spraying line undergoes a comprehensive 24-hour no-load and load test at the factory to verify stability, noise levels, and safety. Production data is fully traceable via integrated ERP, PDM, and MES systems.
Acquiring an automated YT-PJ-2D Mattress Spraying Line involves a standard 30% advance deposit to activate the 50-day manufacturing process, with the remaining 70% balanced upon successful factory testing. This structured payment workflow ensures both manufacturing precision and financial security for global mattress producers. Technical Support: yuantian@yuantian.com
Foshan Yuantian Mattress Machinery Co.,Ltd is a high-tech enterprise specializing in the R&D, production, sales, and service of mattress machinery. Founded in 1982, the company operates a 150,000 square meter production facility and employs over 100+ staff members. It has served global clients across multiple industries, including MOVEIS K1 LTDA in Brazil and HANVICO in Vietnam, holding ISO 9001 quality management certifications.


REPORT