Choosing an order quantity for the HUB adapter means weighing potential unit-price savings against the risk of holding unsold stock. The product listing specifies a 500-unit minimum order and a lead time of 25–30 days. These figures provide a practical starting point, but without price tiers or a demand forecast, they do not establish an ideal order size.
\nStarting with the stated minimum can limit the initial stock commitment. However, a larger purchase may be worth considering if a supplier quote shows meaningful per-unit savings and your sales outlook can support the added inventory.
\nBefore ordering above 500 units, ask for written quotes at several quantities. Compare the savings per unit with the cost of holding additional stock, and use your own sales history or a demand forecast to estimate how quickly the products may sell. The 25–30-day lead time should also fit your sales calendar and replenishment plan.
\nThe HUB adapter connects through Type-C and includes one USB 3.0 port rated at 5 Gbps, one USB 2.0 port rated at 480 Mbps, 100 W power delivery, HDMI output at 4K/30 Hz, and SD and TF card slots. The listing states compatibility with MOS, Windows, Android, and other systems. It is described as plug and play, with no installation driver required.
\nThe supplier reports a 100% pre-shipment inspection and offers replacement or technical support for quality issues. Listed credentials include CE certificate DLE-260313019C and ROHS certificate DLR-260313035C, described as covering phone and computer accessories in the EU/EEA. The company also cites a 100,000-piece customized data cable project for a consumer electronics brand in Argentina, involving branded products for retail and distribution, with stable production and on-time delivery.
\n
| Planning factor | Information provided | What to evaluate |
|---|---|---|
| Minimum order | 500 units | This is the lowest stated entry quantity; no unit price is listed. |
| Orders above the minimum | No quantity-based pricing is specified | Request price breaks and compare the savings with forecast demand and added stock exposure. |
| Delivery timing | 25–30 days | Allow for this lead time when scheduling sales and replenishment. |
| Quality measures | 100% inspection before shipment; replacement or technical support for quality issues | Confirm inspection documentation and the process for resolving any quality concern. |
No. It is the minimum stated for this product, not a demonstrated optimum. Price breaks, holding costs, and buyer-specific demand data would be needed to determine the best balance.
\nGet written quotes for multiple order volumes, estimate the inventory commitment against expected sales, and check that the 25–30-day delivery window works for your schedule.
\nIt has a Type-C input, USB 3.0 and USB 2.0 ports, 100 W PD, HDMI output up to 4K at 30 Hz, and SD and TF slots. The listing names MOS, Windows, Android, and other systems as supported platforms.
\nUse 500 units as the baseline when the priority is limiting initial inventory exposure. Consider a larger purchase only after reviewing written volume quotes and comparing the price reduction with a demand forecast. The listing gives a 25–30-day delivery estimate and describes pre-shipment inspection, replacement, and technical support for quality issues.
\nFABIT operates as an OEM/ODM manufacturer. Its company profile gives a general MOQ of 1,000 units, while this specific HUB adapter listing states 500 units; confirm which
REPORT