Before arranging transport for a prefab capsule house, confirm the precise unit configuration and agree in writing on what the delivery includes. A project file should bring together product drawings, a packing list, packed dimensions and weight, a freight quote, route details, site-access information, and clear responsibility for each step from customs to final acceptance.
The available product listing identifies a Detachable Space Capsule House under the keyword “Prefab Capsule Houses.” It does not specify standard model dimensions, shipping weight, packing quantities, lead time, or export-market requirements. Obtain these details for the selected configuration in the quotation and its supporting documents before booking freight.
Ask the supplier to provide the order drawings, folded and packed measurements, total weight, quantity, and project-specific packing list. These details help the freight provider assess the shipment and allow the receiving site to prepare suitable unloading equipment and access routes.
Match the transport paperwork to the agreed shipping method. Sea freight by FCL or LCL is listed as an available arrangement, but the proposal should state which option applies, along with the loading plan, freight quotation, departure point, destination, and any assumptions about packing and delivery.
Set out each delivery stage separately. Port arrival does not necessarily include delivery to the site, customs clearance, unloading, foundation work, installation, utility connections, or acceptance. The written agreement should name the responsible party for every applicable task and define the acceptance criteria.
Share the project country and city, intended use, order quantity or overall scale, target schedule, preferred configuration, and known access constraints. Include site measurements where available, unloading equipment, foundation details, and utility conditions. If some measurements or requirements are still unknown, identify them so they can be resolved before shipment.
For accommodation or hospitality projects, consider room layouts, shared spaces, cleaning and maintenance needs, and local operating arrangements alongside the physical site conditions. A proposed application does not by itself confirm that a building meets local approval requirements.
Available credentials include an ISO 9001:2015 Quality Management System Certificate covering the processing of prefabricated buildings, including container houses, and a Certificate of Conformity for Factory Production Control under EN 1090-1:2009+A1:2011 for steel structures used in prefabricated buildings. Before relying on either document, check its holder, issuing body, current validity, applicable product or model, and relevance to the destination market.
Reported cooperation projects include modular-space and accommodation work in Uzbekistan, Qatar, Tanzania, Thailand, Malaysia, Azerbaijan, Chile, and the Philippines. Examples include worker accommodation, villas, event accommodation, staff quarters, schools, outdoor camps, and container houses. These references do not guarantee identical specifications, approvals, or delivery terms for another project.
| Topic | Information currently available | Confirm for the order |
|---|---|---|
| Product | A Detachable Space Capsule House is listed | Configuration, drawings, materials, and included supply scope |
| Packing | No project-specific packing data is provided | Folded and packed dimensions, weight, quantity, and packing list |
| Freight | Sea freight by FCL or LCL is listed | Selected method, loading plan, quotation, route, and shipping responsibilities |
| Site readiness | Project-site conditions are not provided | Access, unloading equipment, foundations, utilities, and local requirements |
| Handover | No standard delivery time is stated | Customs, unloading, installation, utility connections, and acceptance ownership |
Request the drawings for the ordered configuration, project packing list, folded and packed dimensions, shipment weight, loading plan, freight quotation, departure and destination details, and written allocation of delivery tasks.
The available product information does not provide standard dimensions, weight, packing quantities, delivery time, or export-market specifications. Confirm each item against the exact project configuration.
Do not assume that one party is responsible for every stage. The proposal should explicitly allocate customs clearance, unloading, foundations, installation, utility connections, and acceptance between the buyer, supplier, and service providers.
Proceed with delivery arrangements once the product configuration, drawings, packing details, freight plan, site conditions, and responsibilities are documented and agreed. YOUTOME works on a project basis, with quantities, specifications, delivery timing, and acceptance conditions determined through each quotation. For technical information or project support, contact bfc@buyfromchina.cn.
Guangdong BFC Technology Co., Ltd. operates YOUTOME as an independently managed brand focused on housing and adaptable physical spaces. Project discussions include folding-expandable housing and modular spaces. BFC coordinates procurement, supply, and export arrangements with modular-building manufacturers and component suppliers. Its main markets include South America, Ecuador, Kazakhstan, Uzbekistan, Tanzania, and the Middle East. Relevant credentials include ISO 9001:2015 and ISO 45001:2018 certificates for activities related to prefabricated buildings, including container houses.