For this project-based purchase model, the recorded terms are a 30% T/T advance payment and a 70% balance payable against a copy of the bill of lading. This is a project-specific reference, not a standard deposit rule for every customized container house order. Confirm the final terms, product scope, inspection requirements and delivery responsibilities in the quotation and signed agreement before payment.
The 30% advance and 70% balance arrangement describes the payment structure on record for this business's project purchases. The final payment is tied to a copy of the bill of lading. Neither the percentage nor the payment trigger should be assumed to apply to every buyer or project; both need to appear clearly in the relevant agreement.
Start by reviewing the written quotation. It should specify the selected model, configuration, quantity, included and excluded items, project conditions, quote validity and schedule assumptions. It should also assign responsibility for packing, transport, customs clearance, unloading, foundations, installation, utility connections, inspection and acceptance.
Before requesting a design, outline the intended use, destination country and city, number of users, required quantity or project scale, site measurements, access conditions, utilities, preferred layout, equipment needs and target timeline. Sketches and site photos can help clarify requirements. A design enquiry alone does not mean the project uses standard dimensions, a stocked conversion or a universal product specification.
The selected configuration can affect both the technical review and the commercial terms. For folding-expandable options, the available product information distinguishes F20 Mini, F20 Basic, F20 Pro and higher-ceiling versions. Before paying, check the project drawings, dimensions, electrical capacity, material specifications, packing quantities and any performance documentation relevant to the chosen model.
Agree on inspection points and acceptance evidence as part of the order. The company profile lists ISO 9001:2015 Quality Management System Certification for processing prefabricated buildings, including container houses, and EN 1090-1:2009+A1:2011 factory production control certification for specified steel structures. These credentials do not replace checks on the specific model, project requirements or approvals required at the destination.
Recorded projects include worker accommodation in Uzbekistan, residential container houses in the United States, villa projects in Tanzania, event accommodation in Qatar, staff quarters in Thailand, a modular school in Malaysia and an outdoor camp in Azerbaijan. These examples show a range of applications, but do not establish that a new order will have the same design, payment arrangement or delivery scope.
| Item | Recorded information | What to verify in writing |
|---|---|---|
| Advance payment | 30% T/T prepayment | Payment milestone, currency, bank details and contractual terms. |
| Final balance | 70% against a copy of the bill of lading | Which bill of lading copy applies and the conditions for document release. |
| Product scope | Model and configuration are set out in the quotation | Drawings, dimensions, materials, equipment and packing details. |
| Inspection | Specifications and acceptance criteria are agreed for the project | Inspection stages, required evidence and the parties responsible for acceptance. |
| Shipping and delivery | Sea freight by FCL or LCL is listed | Freight, customs, unloading, foundations, installation and utility connections. |
| After-sales service | Arranged according to the individual project; no universal warranty is stated | Support provider, service scope and any applicable warranty. |
No. The recorded terms for this project-based purchase model are 30% T/T in advance and 70% against a bill of lading copy, but the applicable arrangement must be confirmed in the project quotation and agreement.
Confirm the model, drawings, configuration, quantity, materials, equipment, inspection criteria, packing and transport plan. The agreement should also clarify customs, unloading, foundations, installation, utility connections, acceptance conditions and each party's responsibilities.
The quotation determines what is included. Building work, optional interior equipment, materials and accessories should be itemized so their scope is clear. Discussions about BFC-related procurement and YOUTOME buildings do not by themselves combine those purchases into one order.
A 30% T/T advance followed by a 70% balance against a bill of lading copy is the documented payment reference for this project-based model. Treat it as a starting point, then agree on the exact configuration, inspection evidence, shipping arrangement and division of delivery responsibilities in writing. Quantity, lead time and after-sales support are also confirmed project by project. For technical proposals or project support, contact bfc@buyfromchina.cn.
Guangdong BFC Technology Co., Ltd. operates YOUTOME, an independently managed brand within the BFC ecosystem focused on housing and adaptable physical spaces. Established in 2012, the company presents light-steel housing, folding-expandable homes and modular spaces for living, stays, business, work and community applications. Project proposals are discussed according to the intended use, users, location, configuration and responsibilities involved. Listed credentials include ISO 45001:2018 Occupational Health and Safety Management System Certification and ISO 9001:2015 Quality Management System Certification.

REPORT