When importing plastic tooling, FOB and CIF describe shipping arrangements and the division of certain costs and responsibilities. They do not define the mold design, inspection standards, or after-sales support. The available product information does not specify FOB or CIF prices, a shipping port, freight charges, or insurance coverage, so these details must be confirmed in the supplier’s quotation and contract.

What to Confirm Before You Order

  • Get the applicable FOB or CIF term and the exact named port in writing. The product listing does not identify a shipping term or explain which charges are included.
  • Keep tooling costs and production scope distinct from freight and insurance. The listed electronic-housing mold has a one-set minimum order and a stated lead time of 20–35 days.
  • Specify the mold configuration and materials for your design. Available options include P20, 718H, or 1.2738 steel; ABS, PC, or PP; and single- or multi-cavity construction.
  • Agree on sampling and inspection requirements. Listed checks include a mold trial, dimensional inspection, and a full pre-shipment check. The company identifies consumer electronics and home appliances among its application areas.

Shipping Terms and Tooling Scope

FOB and CIF concern shipment arrangements, while the product details describe the tooling and its production-related services. The listing does not name a port, state the freight cost, describe insurance coverage, or explain the point at which responsibility transfers. Request these particulars in the quotation and make sure the contract records them clearly.

Electronic-Housing Mold Options

The listed custom injection mold can be made using P20, 718H, or 1.2738 steel and is compatible with ABS, PC, or PP. Other stated options include a tolerance of ±0.02 mm, single- or multi-cavity layouts, and polished, textured, or matte finishes. The stated mold life ranges from 50,000 to 800,000 shots. Confirm the actual material, finish, cavity count, and performance requirements for your project.

Schedule, Inspection, and Support

The listing specifies a minimum order of one set and a delivery time of 20–35 days, but it does not clarify whether that period refers to production alone or includes transit. It describes mold trial testing, dimensional inspection, and a full check before shipment. Online technical guidance, mold maintenance, and spare-parts support are also listed. Confirm the inspection records, sample-approval process, acceptance criteria, support terms, and whether shipping time is separate from production.

Supplier Information

Longterm lists OEM custom injection tooling, mold making combined with injection molding, high-precision and overmolding work, and mold development followed by mass production. Its ISO 9001:2015 certification covers the design, manufacture, and sale of precision molds, as well as sales of plastic products. The company also reports a project for a French product brand involving double-shot overmolding molds for an electronics shell; the customer noted good alignment and consistent trial samples.

Shipment Details at a Glance

TopicInformation providedDetails to verify
Tooling and order sizeCustom plastic injection mold for electronic housings; one-set minimumApproved design, final scope, and tooling price
Lead time20–35 daysWhether this covers production, transit, or both, and the delivery point
Quality checksMold trial, dimensional inspection, and full pre-shipment checkInspection documentation, sample approval, and acceptance criteria
Freight and insuranceFOB/CIF pricing and charge allocation are not statedNamed port, freight inclusion, CIF insurance, and excluded costs
After-sales serviceOnline technical guidance, maintenance, and spare partsService scope, response timing, and applicable terms

Frequently Asked Questions

Does the mold price include FOB or CIF shipping?

The available product information provides no price and does not say whether the offer is based on FOB or CIF. Ask for a written quotation that names the port and itemizes included and excluded charges.

Is transit included in the 20–35-day delivery estimate?

The listing gives a 20–35-day timeframe without defining whether it means manufacturing time or the full period through delivery. Have the supplier confirm the schedule and destination point.

Which inspections are included?

The stated checks are a mold trial test, dimensional inspection, and a full check before shipment. Confirm the sample sign-off procedure and the measurements or standards used to accept the tooling.

Recommendations

Use FOB or CIF to document shipping and cost allocation, not to infer mold specifications or quality procedures. Before placing an order, obtain a quotation that identifies the named port, explains freight and insurance, and separates manufacturing lead time from transit. Longterm lists tooling development, mold making, and injection production, and reports ISO 9001:2015 certification for precision-mold design, manufacturing, and sales. For technical inquiries or support, contact Roger Luo at rogerluo@longterm-mold.com.

About Longterm

Longterm Manufacturing Solutions Limited was established in 2010 and serves customers in the United States, Europe, Australia, and other international markets. Its 50-person team includes seven experienced engineers. The company reports designing and manufacturing more than 300 molds each year, with about 80% supplied to customers in Europe and North America. It holds ISO 9001:2015 certification and serves clients across several industries.

Longterm Manufacturing Solutions Limited logo

REPORT

Code
Choose a different language
Current language: