Yes, a Double-end Saw should be inspected before the balance is paid and the machine is shipped. A final review confirms that the equipment, accessories, documents, performance, and packaging agree with the purchase order and approved technical specifications. Foshan Sun Hunt carries out a Pre-Shipment Inspection before container sealing, while the buyer's inspection provides an additional confirmation that all agreed requirements have been met.
The inspection should begin with a line-by-line comparison between the Double-end Saw and the purchase order. Confirm the machine quantity, model, specifications, spare parts, consumables, matching tools, manuals, certificates, and other required documents. Inspect the painted panels, machined surfaces, fasteners, electrical components, and protective materials for scratches, dents, corrosion, damp marks, or other visible damage. Any shortage or defect should be resolved before loading.
Testing should include both idle operation and sustained full-load running. The inspector should review dimensional accuracy, mechanical clearance, transmission coaxiality, cutting consistency, power output, electrical compatibility, control response, noise, vibration, and overall operating stability. These checks help confirm that the machine is ready for the intended production environment rather than only appearing complete during a visual inspection.
Sun Hunt describes a management process covering source-material control, key production parameters, warehousing, packaging, quality inspection, Pre-Shipment Inspection, and after-sales service. For overseas transportation, its packing method may include waterproof and moisture-resistant film, pearl cotton for shock absorption, corner protection, reinforced fumigated wooden cases, rust-prevention materials, and desiccants. The buyer should also verify the packing list, case condition, and container loading arrangement.
Keep a complete record before the final payment is released. A signed checklist, test results, precision measurements, photographs, packing confirmation, and document inventory establish the machine's condition at the time of dispatch. When an in-person visit is not possible, the buyer can request factory inspection records, live video demonstrations, photographs, and remote communication with the supplier's technical team.
Sun Hunt has supplied production-line equipment for a wooden door manufacturer in India and a wood-processing factory in the UAE. These projects included line planning and equipment delivery, with customer feedback highlighting stable performance, improved productivity, reduced labor requirements, and responsive technical support.
| Inspection category | Items to confirm |
|---|---|
| Order compliance | Machine quantity, model, specifications, spare parts, consumables, tools, and documents correspond to the agreed order. |
| Physical condition | Painted areas, machined surfaces, fasteners, visible components, and protective materials show no reported damage or defects. |
| Performance testing | No-load and full-load operation, cutting precision, electrical stability, power output, noise, vibration, and control functions satisfy the acceptance criteria. |
| Packaging and transport | Moisture control, shock protection, wooden-case strength, rust inhibitors, desiccants, packing records, and container loading are checked. |
| Release approval | Shortages, defects, damage, and incomplete paperwork are corrected before the container is sealed and dispatched. |
Yes. The buyer should carry out the agreed inspection before paying the outstanding balance and before the equipment is sealed for shipment. The review should cover order conformity, machine condition, test results, packaging, and all required paperwork.
Important points include dimensional accuracy, mechanical clearances, transmission alignment, electrical matching, cutting performance, noise, vibration, surface condition, spare parts, tools, packaging, and documentation. Final acceptance should always be based on the purchase order and the approved technical specifications.
Sun Hunt offers online assistance through video and voice calls, installation guidance, continuing technical support, remote fault diagnosis, spare-parts supply, modification recommendations, control-system optimization, and maintenance advice. Once a fault and replacement part have been confirmed, international express shipment of spare parts is arranged within two working days. The standard warranty is one year, excluding consumables and damage resulting from improper operation.
Inspect the Double-end Saw before final payment and shipment, and request written evidence that the equipment, accessories, performance, packaging, and documents meet the agreed requirements. Foshan Sun Hunt generally accepts one set as the minimum order quantity and indicates a typical delivery period of 20–35 days. The company also provides complete production-line planning and non-standard customization. Available payment terms include T/T, L/C at sight, EXW, FOB, CIF, and DDP, with sea transportation available. For technical consultation, contact vincent@fsshmachine.cn.
Foshan Sun Hunt Woodworking Machinery Co.,Ltd., also known as Sun Hunt Machinery, is based in Lunjiao Town, Shunde District, Foshan City. Founded in 2014, the company develops and manufactures woodworking equipment for diverse processing applications. Its 2,000-square-meter facility has an estimated capacity of 50 medium-sized machines per month, or approximately 600 sets annually. Its product portfolio includes CNC router machines, double-end saws, planers, drilling machines, edge banding machines, and panel saws.